Liberia vs Tanzania, United Republic of: Dealing with construction permits, cost
Dealing with construction permits, cost over time
- Liberia
- Tanzania, United Republic of
How they compare
Tanzania, United Republic of currently reports 564.6% against 559.7% in Liberia, a difference of 4.9%.
The two have swapped places 1 time across 7 shared years of data; in 2006 it was Liberia ahead.
Liberia ranks 17th and Tanzania, United Republic of ranks 16th of 50 countries.
Liberia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Liberia | Tanzania, United Republic of | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 4,610.8% | 788.3% | 3,822.4% | Liberia |
| 2010s | 692.7% | 532.1% | 160.7% | Liberia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits, cost, Liberia or Tanzania, United Republic of?
- Tanzania, United Republic of, at 564.6% against 559.7% in Liberia as of 2012.
- What is the difference in dealing with construction permits, cost between Liberia and Tanzania, United Republic of?
- 4.9%, with Tanzania, United Republic of ahead.
- How many years of comparable data are there for Liberia and Tanzania, United Republic of?
- 7 years are reported by both, from 2006 to 2012.
- How do Liberia and Tanzania, United Republic of rank globally for dealing with construction permits, cost?
- Liberia ranks 17th and Tanzania, United Republic of ranks 16th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.