Dealing with construction permits, cost in Liberia

Liberia: Dealing with construction permits, cost was 559.7% in 2012. ◆ Volatile

Latest (2012)
559.7%
Change on year
down 19.4%
World rank
17th
of 50 countries
All-time high
6,820.0%
in 2006
All-time low
559.7%
in 2012
Years of data
7
2006–2012

Dealing with construction permits, cost in Liberia, 2006–2012

02.0k4.0k6.0k2006200920122006: 6.8k % of income per capita2007: 5.8k % of income per capita2008: 5.0k % of income per capita2009: 788.8 % of income per capita2010: 824.4 % of income per capita2011: 694.1 % of income per capita2012: 559.7 % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

Liberia recorded 559.7% for dealing with construction permits, cost in 2012. That is the lowest value across all 7 years on record.

Compared with earlier readings it is down 19.4% on the previous year and down 91.8% over ten years.

That places Liberia 17th out of 50 countries with data for 2012, putting it in the middle of the range.

Dealing with construction permits, cost in Liberia, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in Liberia, 2006 to 2012.
Year % of income per capita Change
2006 6,820.0%
2007 5,845.6% -14.3%
2008 4,988.7% -14.7%
2009 788.8% -84.2%
2010 824.4% +4.5%
2011 694.1% -15.8%
2012 559.7% -19.4%

Averages by decade

DecadeAverage LowestHighest Years
2000s 4,610.8% 788.8% 6,820.0% 4
2010s 692.7% 559.7% 824.4% 3

Countries ranked near Liberia

  1. 14 Uganda 853.1% compare
  2. 15 Guinea-Bissau 785.2% compare
  3. 16 Tanzania, United Republic of 564.6% compare
  4. 18 Senegal 529.1% compare
  5. 19 Ghana 481.2% compare
  6. 20 Cape Verde 459.4% compare

See the full ranking of 56 places →

More private sector data for Liberia

All data for Liberia →

Frequently asked questions

What is dealing with construction permits, cost in Liberia?
Dealing with construction permits, cost in Liberia was 559.7% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in Liberia?
The highest recorded value was 6,820.0% in 2006.
What is the lowest dealing with construction permits, cost recorded in Liberia?
The lowest recorded value was 559.7% in 2012.
How does Liberia rank for dealing with construction permits, cost?
Liberia ranks 17th out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in Liberia?
Over the last ten years it is down 91.8%. The long-run trend across the full record is volatile.
Where does this Liberia data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 7 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in Liberia. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 03 September 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/liberia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/liberia/">Dealing with construction permits, cost in Liberia</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.