Mali vs Togo: Dealing with construction permits, cost
Dealing with construction permits, cost over time
- Mali
- Togo
How they compare
Togo currently reports 431.5% against 418.6% in Mali, a difference of 12.9%.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Mali ahead.
Mali ranks 22nd and Togo ranks 21st of 50 countries.
Across the 2 decades both report, Mali averaged higher in 1 and Togo in 1.
Head to head by decade
| Decade | Mali | Togo | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 994.3% | 602.9% | 391.4% | Mali |
| 2010s | 416.0% | 525.1% | 109.1% | Togo |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits, cost, Mali or Togo?
- Togo, at 431.5% against 418.6% in Mali as of 2012.
- What is the difference in dealing with construction permits, cost between Mali and Togo?
- 12.9%, with Togo ahead.
- How many years of comparable data are there for Mali and Togo?
- 8 years are reported by both, from 2005 to 2012.
- How do Mali and Togo rank globally for dealing with construction permits, cost?
- Mali ranks 22nd and Togo ranks 21st of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.