Dealing with construction permits, cost in Togo

Togo: Dealing with construction permits, cost was 431.5% in 2012. ▼ Falling

Latest (2012)
431.5%
Change on year
down 22.8%
World rank
21st
of 50 countries
All-time high
644.2%
in 2008
All-time low
431.5%
in 2012
Years of data
8
2005–2012

Dealing with construction permits, cost in Togo, 2005–2012

02004006002005200820122005: 529.2 % of income per capita2006: 621 % of income per capita2007: 628.7 % of income per capita2008: 644.2 % of income per capita2009: 591.4 % of income per capita2010: 584.6 % of income per capita2011: 559.2 % of income per capita2012: 431.5 % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

Togo recorded 431.5% for dealing with construction permits, cost in 2012. That is the lowest value across all 8 years on record.

Compared with earlier readings it is down 22.8% on the previous year and down 18.5% over ten years.

That places Togo 21st out of 50 countries with data for 2012, putting it in the middle of the range.

Dealing with construction permits, cost in Togo, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in Togo, 2005 to 2012.
Year % of income per capita Change
2005 529.2%
2006 621.0% +17.3%
2007 628.7% +1.2%
2008 644.2% +2.5%
2009 591.4% -8.2%
2010 584.6% -1.1%
2011 559.2% -4.3%
2012 431.5% -22.8%

Averages by decade

DecadeAverage LowestHighest Years
2000s 602.9% 529.2% 644.2% 5
2010s 525.1% 431.5% 584.6% 3

Countries ranked near Togo

  1. 18 Senegal 529.1% compare
  2. 19 Ghana 481.2% compare
  3. 20 Cape Verde 459.4% compare
  4. 22 Mali 418.6% compare
  5. 23 Nigeria 417.7% compare
  6. 24 Sao Tome and Principe 386.7% compare

See the full ranking of 56 places →

More private sector data for Togo

All data for Togo →

Frequently asked questions

What is dealing with construction permits, cost in Togo?
Dealing with construction permits, cost in Togo was 431.5% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in Togo?
The highest recorded value was 644.2% in 2008.
What is the lowest dealing with construction permits, cost recorded in Togo?
The lowest recorded value was 431.5% in 2012.
How does Togo rank for dealing with construction permits, cost?
Togo ranks 21st out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in Togo?
Over the last ten years it is down 18.5%. The long-run trend across the full record is falling.
Where does this Togo data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in Togo. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 03 September 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/togo/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/togo/">Dealing with construction permits, cost in Togo</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.