Morocco vs Tunisia: Dealing with construction permits, cost
Dealing with construction permits, cost over time
- Morocco
- Tunisia
How they compare
Tunisia currently reports 256.0% against 220.2% in Morocco, a difference of 35.8%.
That makes Tunisia's figure about 1.2 times Morocco's.
Across all 8 years both countries report, Tunisia has been ahead every year.
Morocco ranks 31st and Tunisia ranks 29th of 50 countries.
Tunisia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Morocco | Tunisia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 324.2% | 434.6% | 110.4% | Tunisia |
| 2010s | 233.6% | 275.4% | 41.8% | Tunisia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits, cost, Morocco or Tunisia?
- Tunisia, at 256.0% against 220.2% in Morocco as of 2012.
- What is the difference in dealing with construction permits, cost between Morocco and Tunisia?
- 35.8%, with Tunisia ahead.
- How many years of comparable data are there for Morocco and Tunisia?
- 8 years are reported by both, from 2005 to 2012.
- How do Morocco and Tunisia rank globally for dealing with construction permits, cost?
- Morocco ranks 31st and Tunisia ranks 29th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.