Niger vs Sub-Saharan Africa: Dealing with construction permits, cost
Dealing with construction permits, cost over time
- Niger
- Sub-Saharan Africa
How they compare
Niger currently reports 1,612.8% against 751.6% in Sub-Saharan Africa, a difference of 861.2%.
That makes Niger's figure about 2.1 times Sub-Saharan Africa's.
The two have swapped places 2 times across 8 shared years of data; in 2005 it was Niger ahead.
Niger ranks 7th and Sub-Saharan Africa ranks 4th of 50 countries.
Across the 2 decades both report, Niger averaged higher in 1 and Sub-Saharan Africa in 1.
Head to head by decade
| Decade | Niger | Sub-Saharan Africa | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 2,021.6% | 2,119.5% | 97.9% | Sub-Saharan Africa |
| 2010s | 1,661.2% | 898.9% | 762.3% | Niger |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits, cost, Niger or Sub-Saharan Africa?
- Niger, at 1,612.8% against 751.6% in Sub-Saharan Africa as of 2012.
- What is the difference in dealing with construction permits, cost between Niger and Sub-Saharan Africa?
- 861.2%, with Niger ahead.
- How many years of comparable data are there for Niger and Sub-Saharan Africa?
- 8 years are reported by both, from 2005 to 2012.
- How do Niger and Sub-Saharan Africa rank globally for dealing with construction permits, cost?
- Niger ranks 7th and Sub-Saharan Africa ranks 4th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.