Seychelles vs South Africa: Dealing with construction permits, cost
Dealing with construction permits, cost over time
- Seychelles
- South Africa
How they compare
South Africa currently reports 33.4% against 25.3% in Seychelles, a difference of 8.1%.
That makes South Africa's figure about 1.3 times Seychelles's.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Seychelles ahead.
Seychelles ranks 50th and South Africa ranks 48th of 50 countries.
Across the 2 decades both report, Seychelles averaged higher in 1 and South Africa in 1.
Head to head by decade
| Decade | Seychelles | South Africa | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 37.0% | 30.7% | 6.3% | Seychelles |
| 2010s | 30.1% | 31.0% | 0.9% | South Africa |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits, cost, Seychelles or South Africa?
- South Africa, at 33.4% against 25.3% in Seychelles as of 2012.
- What is the difference in dealing with construction permits, cost between Seychelles and South Africa?
- 8.1%, with South Africa ahead.
- How many years of comparable data are there for Seychelles and South Africa?
- 8 years are reported by both, from 2005 to 2012.
- How do Seychelles and South Africa rank globally for dealing with construction permits, cost?
- Seychelles ranks 50th and South Africa ranks 48th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.