Dealing with construction permits, cost in South Africa

South Africa: Dealing with construction permits, cost was 33.4% in 2012. ▼ Falling

Latest (2012)
33.4%
Change on year
down 8.7%
World rank
48th
of 50 countries
All-time high
37.5%
in 2005
All-time low
23.1%
in 2010
Years of data
8
2005–2012

Dealing with construction permits, cost in South Africa, 2005–2012

0102030402005200820122005: 37.5 % of income per capita2006: 33.5 % of income per capita2007: 30.4 % of income per capita2008: 27.5 % of income per capita2009: 24.5 % of income per capita2010: 23.1 % of income per capita2011: 36.6 % of income per capita2012: 33.4 % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

In 2012, dealing with construction permits, cost in South Africa stood at 33.4%.

The figure is down 8.7% on the previous year and down 10.9% over ten years.

That places South Africa 48th out of 50 countries with data for 2012, putting it in the bottom quarter.

Dealing with construction permits, cost in South Africa, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in South Africa, 2005 to 2012.
Year % of income per capita Change
2005 37.5%
2006 33.5% -10.7%
2007 30.4% -9.3%
2008 27.5% -9.5%
2009 24.5% -10.9%
2010 23.1% -5.7%
2011 36.6% +58.4%
2012 33.4% -8.7%

Averages by decade

DecadeAverage LowestHighest Years
2000s 30.7% 24.5% 37.5% 5
2010s 31.0% 23.1% 36.6% 3

Countries ranked near South Africa

  1. 45 Gabon 79.3% compare
  2. 46 Comoros 74.5% compare
  3. 47 Algeria 54.6% compare
  4. 49 Mauritius 28.5% compare
  5. 50 Seychelles 25.3% compare

See the full ranking of 56 places →

More private sector data for South Africa

All data for South Africa →

Frequently asked questions

What is dealing with construction permits, cost in South Africa?
Dealing with construction permits, cost in South Africa was 33.4% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in South Africa?
The highest recorded value was 37.5% in 2005.
What is the lowest dealing with construction permits, cost recorded in South Africa?
The lowest recorded value was 23.1% in 2010.
How does South Africa rank for dealing with construction permits, cost?
South Africa ranks 48th out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in South Africa?
Over the last ten years it is down 10.9%. The long-run trend across the full record is falling.
Where does this South Africa data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in South Africa. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 07 September 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/south-africa/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/south-africa/">Dealing with construction permits, cost in South Africa</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.