Chad vs Congo, Democratic Republic of the: Dealing with construction permits: Cost

Chad
18.8%
in 2019
Congo, Democratic Republic of the
13.8%
in 2019
Chad rank
11th
Congo, Democratic Republic of the rank
13th

Dealing with construction permits: Cost over time

  • Chad
  • Congo, Democratic Republic of the
0102030200520122019

How they compare

Chad currently reports 18.8% against 13.8% in Congo, Democratic Republic of the, a difference of 5.0%.

That makes Chad's figure about 1.4 times Congo, Democratic Republic of the's.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Congo, Democratic Republic of the ahead.

Chad ranks 11th and Congo, Democratic Republic of the ranks 13th of 187 countries.

Across the 2 decades both report, Chad averaged higher in 1 and Congo, Democratic Republic of the in 1.

Head to head by decade

Decade Chad Congo, Democratic Republic of the Difference Ahead
2000s 21.5% 26.3% 4.8% Congo, Democratic Republic of the
2010s 17.7% 16.7% 1.0% Chad

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Chad or Congo, Democratic Republic of the?
Chad, at 18.8% against 13.8% in Congo, Democratic Republic of the as of 2019.
What is the difference in dealing with construction permits: cost between Chad and Congo, Democratic Republic of the?
5.0%, with Chad ahead.
How many years of comparable data are there for Chad and Congo, Democratic Republic of the?
15 years are reported by both, from 2005 to 2019.
How do Chad and Congo, Democratic Republic of the rank globally for dealing with construction permits: cost?
Chad ranks 11th and Congo, Democratic Republic of the ranks 13th of 187 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Chad vs Congo, Democratic Republic of the: Dealing with construction permits: Cost. Statizoid. Retrieved 22 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/chad/congo-dem-rep/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/chad/congo-dem-rep/">Chad vs Congo, Democratic Republic of the: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.