Dealing with construction permits: Cost (% of Warehouse value) in Democratic Republic of Congo

Democratic Republic of Congo: Dealing with construction permits: Cost (% of Warehouse value) was 13.8% in 2019. ▼ Falling

Latest (2019)
13.8%
Change on year
down 8.0%
World rank
13th
of 188 countries
All-time high
28.8%
in 2005
All-time low
13.8%
in 2016
Years of data
15
2005–2019

Dealing with construction permits: Cost in Democratic Republic of Congo, 2005–2019

01020302005201220192005: 28.8 % of Warehouse value2006: 28.8 % of Warehouse value2007: 26.5 % of Warehouse value2008: 24.7 % of Warehouse value2009: 22.6 % of Warehouse value2010: 21.7 % of Warehouse value2011: 19.3 % of Warehouse value2012: 18.3 % of Warehouse value2013: 15.9 % of Warehouse value2014: 19.5 % of Warehouse value2015: 13.9 % of Warehouse value2016: 13.8 % of Warehouse value2017: 16.1 % of Warehouse value2018: 15 % of Warehouse value2019: 13.8 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

Democratic Republic of Congo recorded 13.8% for dealing with construction permits: cost in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 8.0% on the previous year and down 38.9% over ten years.

Over the whole period, dealing with construction permits: cost in Democratic Republic of Congo peaked at 28.8% in 2005 and was at its lowest, 13.8%, in 2016.

Democratic Republic of Congo ranks 13th of 188 countries on this measure, in the top 10%.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Cost (% of Warehouse value) in Democratic Republic of Congo, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) in Democratic Republic of Congo, 2005 to 2019.
Year % of Warehouse value Change
2005 28.8% —
2006 28.8% +0.0%
2007 26.5% -8.0%
2008 24.7% -6.8%
2009 22.6% -8.5%
2010 21.7% -4.0%
2011 19.3% -11.1%
2012 18.3% -5.2%
2013 15.9% -13.1%
2014 19.5% +22.6%
2015 13.9% -28.7%
2016 13.8% -0.7%
2017 16.1% +16.7%
2018 15.0% -6.8%
2019 13.8% -8.0%

Democratic Republic of Congo compared with similar countries

  • Democratic Republic of Congo's 13.8% is above the median for low income countries, which is 11.8%, 1.2× the median. (22 countries reporting)
  • Democratic Republic of Congo's 13.8% is above the median for Sub-Saharan Africa, which is 6.7%, 2.1× the median. (46 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 26.3% 22.6% 28.8% 5
2010s 16.7% 13.8% 21.7% 10

Countries ranked near Democratic Republic of Congo

  1. 10 Solomon Islands 19.7% compare
  2. 11 Chad 18.8% compare
  3. 12 Cameroon 17.6% compare
  4. 14 Palestine 12.7% compare
  5. 15 Ethiopia 12.6% compare
  6. 15 Zimbabwe 12.6% compare

See the full ranking of 188 places →

More private sector data for Democratic Republic of Congo

All data for Democratic Republic of Congo →

Frequently asked questions

What is dealing with construction permits: cost in Democratic Republic of Congo?
Dealing with construction permits: cost in Democratic Republic of Congo was 13.8% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Democratic Republic of Congo?
The highest recorded value was 28.8% in 2005.
What is the lowest dealing with construction permits: cost recorded in Democratic Republic of Congo?
The lowest recorded value was 13.8% in 2016.
How does Democratic Republic of Congo rank for dealing with construction permits: cost?
Democratic Republic of Congo ranks 13th out of 188 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Democratic Republic of Congo?
Over the last ten years it is down 38.9%. The long-run trend across the full record is falling.
Where does this Democratic Republic of Congo data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Democratic Republic of Congo. Statizoid. Retrieved 07 November 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/congo-dem-rep/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/congo-dem-rep/">Dealing with construction permits: Cost in Democratic Republic of Congo</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.