Congo, Democratic Republic of the vs Ethiopia: Dealing with construction permits: Cost

Congo, Democratic Republic of the
13.8%
in 2019
Ethiopia
12.6%
in 2019
Congo, Democratic Republic of the rank
13th
Ethiopia rank
15th

Dealing with construction permits: Cost over time

  • Congo, Democratic Republic of the
  • Ethiopia
010203040200520122019

How they compare

Congo, Democratic Republic of the currently reports 13.8% against 12.6% in Ethiopia, a difference of 1.2%.

That makes Congo, Democratic Republic of the's figure about 1.1 times Ethiopia's.

The two have swapped places 3 times across 15 shared years of data; in 2005 it was Ethiopia ahead.

Congo, Democratic Republic of the ranks 13th and Ethiopia ranks 15th of 188 countries.

Congo, Democratic Republic of the has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Congo, Democratic Republic of the Ethiopia Difference Ahead
2000s 26.3% 23.6% 2.7% Congo, Democratic Republic of the
2010s 16.7% 15.6% 1.1% Congo, Democratic Republic of the

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Congo, Democratic Republic of the or Ethiopia?
Congo, Democratic Republic of the, at 13.8% against 12.6% in Ethiopia as of 2019.
What is the difference in dealing with construction permits: cost between Congo, Democratic Republic of the and Ethiopia?
1.2%, with Congo, Democratic Republic of the ahead.
How many years of comparable data are there for Congo, Democratic Republic of the and Ethiopia?
15 years are reported by both, from 2005 to 2019.
How do Congo, Democratic Republic of the and Ethiopia rank globally for dealing with construction permits: cost?
Congo, Democratic Republic of the ranks 13th and Ethiopia ranks 15th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Congo, Democratic Republic of the vs Ethiopia: Dealing with construction permits: Cost. Statizoid. Retrieved 27 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/congo-dem-rep/ethiopia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/congo-dem-rep/ethiopia/">Congo, Democratic Republic of the vs Ethiopia: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.