Democratic Republic of Congo vs Palestine: Dealing with construction permits: Cost (% of Warehouse value)
Dealing with construction permits: Cost (% of Warehouse value) over time
- Democratic Republic of Congo
- Palestine
How they compare
Democratic Republic of Congo currently reports 13.8% against 12.7% in Palestine, a difference of 1.1%.
That makes Democratic Republic of Congo's figure about 1.1 times Palestine's.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Palestine ahead.
Democratic Republic of Congo ranks 13th and Palestine ranks 14th of 188 countries.
Palestine has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Democratic Republic of Congo | Palestine | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 26.3% | 38.3% | 12.0% | Palestine |
| 2010s | 16.7% | 22.1% | 5.4% | Palestine |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: cost, Democratic Republic of Congo or Palestine?
- Democratic Republic of Congo, at 13.8% against 12.7% in Palestine as of 2019.
- What is the difference in dealing with construction permits: cost between Democratic Republic of Congo and Palestine?
- 1.1%, with Democratic Republic of Congo ahead.
- How many years of comparable data are there for Democratic Republic of Congo and Palestine?
- 15 years are reported by both, from 2005 to 2019.
- How do Democratic Republic of Congo and Palestine rank globally for dealing with construction permits: cost?
- Democratic Republic of Congo ranks 13th and Palestine ranks 14th of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.