Congo vs Vanuatu: Dealing with construction permits: Cost

Congo
9.3%
in 2019
Vanuatu
9.4%
in 2019
Congo rank
27th
Vanuatu rank
26th

Dealing with construction permits: Cost over time

  • Congo
  • Vanuatu
051015200520122019

How they compare

Vanuatu currently reports 9.4% against 9.3% in Congo, a difference of 0.1%.

The two have swapped places 3 times across 15 shared years of data; in 2005 it was Congo ahead.

Congo ranks 27th and Vanuatu ranks 26th of 187 countries.

Across the 2 decades both report, Congo averaged higher in 1 and Vanuatu in 1.

Head to head by decade

Decade Congo Vanuatu Difference Ahead
2000s 12.1% 10.1% 2.0% Congo
2010s 9.5% 9.7% 0.2% Vanuatu

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Congo or Vanuatu?
Vanuatu, at 9.4% against 9.3% in Congo as of 2019.
What is the difference in dealing with construction permits: cost between Congo and Vanuatu?
0.1%, with Vanuatu ahead.
How many years of comparable data are there for Congo and Vanuatu?
15 years are reported by both, from 2005 to 2019.
How do Congo and Vanuatu rank globally for dealing with construction permits: cost?
Congo ranks 27th and Vanuatu ranks 26th of 187 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Congo vs Vanuatu: Dealing with construction permits: Cost. Statizoid. Retrieved 20 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/congo-rep/vanuatu/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/congo-rep/vanuatu/">Congo vs Vanuatu: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.