Dealing with construction permits: Cost (% of Warehouse value) in Vanuatu

Vanuatu: Dealing with construction permits: Cost (% of Warehouse value) was 9.4% in 2019. ▼ Falling

Latest (2019)
9.4%
Change on year
up 1.1%
World rank
26th
of 188 countries
All-time high
11.9%
in 2005
All-time low
6.9%
in 2010
Years of data
15
2005–2019

Dealing with construction permits: Cost in Vanuatu, 2005–2019

02.557.51012.52005201220192005: 11.9 % of Warehouse value2006: 11.1 % of Warehouse value2007: 10 % of Warehouse value2008: 10 % of Warehouse value2009: 7.6 % of Warehouse value2010: 6.9 % of Warehouse value2011: 9.1 % of Warehouse value2012: 10.9 % of Warehouse value2013: 10.6 % of Warehouse value2014: 10.6 % of Warehouse value2015: 10.2 % of Warehouse value2016: 9.8 % of Warehouse value2017: 9.8 % of Warehouse value2018: 9.3 % of Warehouse value2019: 9.4 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

In 2019, dealing with construction permits: cost in Vanuatu stood at 9.4%.

That represents a change of up 1.1% on the previous year and up 23.7% over ten years.

Over the whole period, dealing with construction permits: cost in Vanuatu peaked at 11.9% in 2005 and was at its lowest, 6.9%, in 2010.

That places Vanuatu 26th out of 188 countries with data for 2019, putting it in the top quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Cost (% of Warehouse value) in Vanuatu, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) in Vanuatu, 2005 to 2019.
Year % of Warehouse value Change
2005 11.9% —
2006 11.1% -6.7%
2007 10.0% -9.9%
2008 10.0% +0.0%
2009 7.6% -24.0%
2010 6.9% -9.2%
2011 9.1% +31.9%
2012 10.9% +19.8%
2013 10.6% -2.8%
2014 10.6% +0.0%
2015 10.2% -3.8%
2016 9.8% -3.9%
2017 9.8% +0.0%
2018 9.3% -5.1%
2019 9.4% +1.1%

Vanuatu compared with similar countries

  • Vanuatu's 9.4% is above the median for lower middle income countries, which is 4.6%, 2.0× the median. (47 countries reporting)
  • Vanuatu's 9.4% is above the median for East Asia & Pacific, which is 2.2%, 4.3× the median. (28 countries reporting)

Biggest year-on-year movements

Years where Dealing with construction permits: Cost (% of Warehouse value) in Vanuatu changed far more than this series normally does. A large move can be a real event or a change in how the figure was measured — the source note below says who published it.

YearChange FromTo
2011 +31.9% 6.9% 9.1%

Averages by decade

DecadeAverage LowestHighest Years
2000s 10.1% 7.6% 11.9% 5
2010s 9.7% 6.9% 10.9% 10

Countries ranked near Vanuatu

  1. 23 Syria 9.6% compare
  2. 23 Togo 9.6% compare
  3. 25 Mexico 9.5% compare
  4. 27 Congo 9.3% compare
  5. 27 Mali 9.3% compare
  6. 29 Croatia 9.2% compare

See the full ranking of 188 places →

More private sector data for Vanuatu

All data for Vanuatu →

Frequently asked questions

What is dealing with construction permits: cost in Vanuatu?
Dealing with construction permits: cost in Vanuatu was 9.4% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Vanuatu?
The highest recorded value was 11.9% in 2005.
What is the lowest dealing with construction permits: cost recorded in Vanuatu?
The lowest recorded value was 6.9% in 2010.
How does Vanuatu rank for dealing with construction permits: cost?
Vanuatu ranks 26th out of 188 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Vanuatu?
Over the last ten years it is up 23.7%. The long-run trend across the full record is falling.
Where does this Vanuatu data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Vanuatu. Statizoid. Retrieved 07 November 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/vanuatu/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/vanuatu/">Dealing with construction permits: Cost in Vanuatu</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.