Guinea vs Uganda: Dealing with construction permits: Cost

Guinea
7.3%
in 2019
Uganda
7.4%
in 2019
Guinea rank
39th
Uganda rank
38th

Dealing with construction permits: Cost over time

  • Guinea
  • Uganda
1020304050200520122019

How they compare

Uganda currently reports 7.4% against 7.3% in Guinea, a difference of 0.1%.

The two have swapped places 3 times across 15 shared years of data; in 2005 it was Guinea ahead.

Guinea ranks 39th and Uganda ranks 38th of 188 countries.

Guinea has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Guinea Uganda Difference Ahead
2000s 33.4% 28.5% 4.9% Guinea
2010s 15.3% 11.8% 3.4% Guinea

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Guinea or Uganda?
Uganda, at 7.4% against 7.3% in Guinea as of 2019.
What is the difference in dealing with construction permits: cost between Guinea and Uganda?
0.1%, with Uganda ahead.
How many years of comparable data are there for Guinea and Uganda?
15 years are reported by both, from 2005 to 2019.
How do Guinea and Uganda rank globally for dealing with construction permits: cost?
Guinea ranks 39th and Uganda ranks 38th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Guinea vs Uganda: Dealing with construction permits: Cost. Statizoid. Retrieved 24 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/guinea/uganda/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/guinea/uganda/">Guinea vs Uganda: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.