Dealing with construction permits: Cost in Uganda

Uganda: Dealing with construction permits: Cost was 7.4% in 2019. β—† Volatile

Latest (2019)
7.4%
Change on year
down 8.6%
World rank
38th
of 187 countries
All-time high
32.7%
in 2005
All-time low
7.4%
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Cost in Uganda, 2005–2019

1020302005201220192005: 32.7 % of Warehouse value2006: 31.6 % of Warehouse value2007: 30.2 % of Warehouse value2008: 26.1 % of Warehouse value2009: 21.7 % of Warehouse value2010: 18.5 % of Warehouse value2011: 16.5 % of Warehouse value2012: 14.8 % of Warehouse value2013: 14.5 % of Warehouse value2014: 11.8 % of Warehouse value2015: 9.7 % of Warehouse value2016: 9 % of Warehouse value2017: 8 % of Warehouse value2018: 8.1 % of Warehouse value2019: 7.4 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

In 2019, dealing with construction permits: cost in Uganda stood at 7.4%. That is the lowest value across all 15 years on record.

That represents a change of down 8.6% on the previous year and down 65.9% over ten years.

Over the whole period, dealing with construction permits: cost in Uganda peaked at 32.7% in 2005 and was at its lowest, 7.4%, in 2019.

Uganda ranks 38th of 187 countries on this measure, in the top quarter.

The series is highly variable year to year, so single readings are best treated with caution.

Averages by decade

DecadeAverage LowestHighest Years
2000s 28.5% 21.7% 32.7% 5
2010s 11.8% 7.4% 18.5% 10

Countries ranked near Uganda

  1. 35 Senegal 7.8% compare
  2. 36 Lebanon 7.7% compare
  3. 37 Burkina Faso 7.6% compare
  4. 39 Guinea 7.3% compare
  5. 39 San Marino 7.3% compare
  6. 41 Colombia 6.9% compare

See the full ranking of 187 places β†’

More private sector data for Uganda

All data for Uganda β†’

Frequently asked questions

What is dealing with construction permits: cost in Uganda?
Dealing with construction permits: cost in Uganda was 7.4% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Uganda?
The highest recorded value was 32.7% in 2005.
What is the lowest dealing with construction permits: cost recorded in Uganda?
The lowest recorded value was 7.4% in 2019.
How does Uganda rank for dealing with construction permits: cost?
Uganda ranks 38th out of 187 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Uganda?
Over the last ten years it is down 65.9%. The long-run trend across the full record is volatile.
Where does this Uganda data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV Β· JSON β€” 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Uganda. Statizoid. Retrieved 19 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/uganda/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/uganda/">Dealing with construction permits: Cost in Uganda</a> β€” Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.