Haiti vs Solomon Islands: Dealing with construction permits: Cost
Dealing with construction permits: Cost over time
- Haiti
- Solomon Islands
How they compare
Haiti currently reports 21.9% against 19.7% in Solomon Islands, a difference of 2.2%.
That makes Haiti's figure about 1.1 times Solomon Islands's.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Solomon Islands ahead.
Haiti ranks 7th and Solomon Islands ranks 10th of 188 countries.
Solomon Islands has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Haiti | Solomon Islands | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 25.0% | 59.8% | 34.8% | Solomon Islands |
| 2010s | 24.4% | 27.6% | 3.2% | Solomon Islands |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: cost, Haiti or Solomon Islands?
- Haiti, at 21.9% against 19.7% in Solomon Islands as of 2019.
- What is the difference in dealing with construction permits: cost between Haiti and Solomon Islands?
- 2.2%, with Haiti ahead.
- How many years of comparable data are there for Haiti and Solomon Islands?
- 15 years are reported by both, from 2005 to 2019.
- How do Haiti and Solomon Islands rank globally for dealing with construction permits: cost?
- Haiti ranks 7th and Solomon Islands ranks 10th of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.