Dealing with construction permits: Cost in Haiti

Haiti: Dealing with construction permits: Cost was 21.9% in 2019. ▼ Falling

Latest (2019)
21.9%
Change on year
down 7.2%
World rank
7th
of 187 countries
All-time high
32.4%
in 2005
All-time low
16.7%
in 2009
Years of data
15
2005–2019

Dealing with construction permits: Cost in Haiti, 2005–2019

01020302005201220192005: 32.4 % of Warehouse value2006: 27 % of Warehouse value2007: 26.6 % of Warehouse value2008: 22.4 % of Warehouse value2009: 16.7 % of Warehouse value2010: 17.2 % of Warehouse value2011: 24.2 % of Warehouse value2012: 30.3 % of Warehouse value2013: 27.7 % of Warehouse value2014: 25.9 % of Warehouse value2015: 24.9 % of Warehouse value2016: 24.3 % of Warehouse value2017: 24.1 % of Warehouse value2018: 23.6 % of Warehouse value2019: 21.9 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

The most recent figure for dealing with construction permits: cost in Haiti is 21.9%, measured in 2019.

The figure is down 7.2% on the previous year and up 31.1% over ten years.

Over the whole period, dealing with construction permits: cost in Haiti peaked at 32.4% in 2005 and was at its lowest, 16.7%, in 2009.

Haiti ranks 7th of 187 countries on this measure, in the top 10%.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Cost in Haiti, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) in Haiti, 2005 to 2019.
Year % of Warehouse value Change
2005 32.4%
2006 27.0% -16.7%
2007 26.6% -1.5%
2008 22.4% -15.8%
2009 16.7% -25.4%
2010 17.2% +3.0%
2011 24.2% +40.7%
2012 30.3% +25.2%
2013 27.7% -8.6%
2014 25.9% -6.5%
2015 24.9% -3.9%
2016 24.3% -2.4%
2017 24.1% -0.8%
2018 23.6% -2.1%
2019 21.9% -7.2%

Averages by decade

DecadeAverage LowestHighest Years
2000s 25.0% 16.7% 32.4% 5
2010s 24.4% 17.2% 30.3% 10

Countries ranked near Haiti

  1. 4 Liberia 24.1% compare
  2. 5 Guinea-Bissau 23.7% compare
  3. 6 Central African Republic 23.2% compare
  4. 8 Sierra Leone 21.5% compare
  5. 9 Bosnia and Herzegovina 20.3% compare
  6. 10 Solomon Islands 19.7% compare

See the full ranking of 187 places →

More private sector data for Haiti

All data for Haiti →

Frequently asked questions

What is dealing with construction permits: cost in Haiti?
Dealing with construction permits: cost in Haiti was 21.9% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Haiti?
The highest recorded value was 32.4% in 2005.
What is the lowest dealing with construction permits: cost recorded in Haiti?
The lowest recorded value was 16.7% in 2009.
How does Haiti rank for dealing with construction permits: cost?
Haiti ranks 7th out of 187 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Haiti?
Over the last ten years it is up 31.1%. The long-run trend across the full record is falling.
Where does this Haiti data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Haiti. Statizoid. Retrieved 23 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/haiti/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/haiti/">Dealing with construction permits: Cost in Haiti</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.