Honduras vs Syrian Arab Republic: Dealing with construction permits: Cost

Honduras
11.4%
in 2019
Syrian Arab Republic
9.6%
in 2012
Honduras rank
20th
Syrian Arab Republic rank
23rd

Dealing with construction permits: Cost over time

  • Honduras
  • Syrian Arab Republic
5101520200520122019

How they compare

Honduras currently reports 11.4% against 9.6% in Syrian Arab Republic, a difference of 1.8%.

That makes Honduras's figure about 1.2 times Syrian Arab Republic's.

Across all 8 years both countries report, Syrian Arab Republic has been ahead every year.

Honduras ranks 20th and Syrian Arab Republic ranks 23rd of 188 countries.

Syrian Arab Republic has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Honduras Syrian Arab Republic Difference Ahead
2000s 8.3% 15.3% 7.0% Syrian Arab Republic
2010s 6.5% 10.2% 3.7% Syrian Arab Republic

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Honduras or Syrian Arab Republic?
Honduras, at 11.4% against 9.6% in Syrian Arab Republic as of 2019.
What is the difference in dealing with construction permits: cost between Honduras and Syrian Arab Republic?
1.8%, with Honduras ahead.
How many years of comparable data are there for Honduras and Syrian Arab Republic?
8 years are reported by both, from 2005 to 2012.
How do Honduras and Syrian Arab Republic rank globally for dealing with construction permits: cost?
Honduras ranks 20th and Syrian Arab Republic ranks 23rd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Honduras vs Syrian Arab Republic: Dealing with construction permits: Cost. Statizoid. Retrieved 03 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/honduras/syrian-arab-republic/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/honduras/syrian-arab-republic/">Honduras vs Syrian Arab Republic: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.