Honduras vs Syrian Arab Republic: Dealing with construction permits: Cost
Dealing with construction permits: Cost over time
- Honduras
- Syrian Arab Republic
How they compare
Honduras currently reports 11.4% against 9.6% in Syrian Arab Republic, a difference of 1.8%.
That makes Honduras's figure about 1.2 times Syrian Arab Republic's.
Across all 8 years both countries report, Syrian Arab Republic has been ahead every year.
Honduras ranks 20th and Syrian Arab Republic ranks 23rd of 188 countries.
Syrian Arab Republic has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Honduras | Syrian Arab Republic | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 8.3% | 15.3% | 7.0% | Syrian Arab Republic |
| 2010s | 6.5% | 10.2% | 3.7% | Syrian Arab Republic |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: cost, Honduras or Syrian Arab Republic?
- Honduras, at 11.4% against 9.6% in Syrian Arab Republic as of 2019.
- What is the difference in dealing with construction permits: cost between Honduras and Syrian Arab Republic?
- 1.8%, with Honduras ahead.
- How many years of comparable data are there for Honduras and Syrian Arab Republic?
- 8 years are reported by both, from 2005 to 2012.
- How do Honduras and Syrian Arab Republic rank globally for dealing with construction permits: cost?
- Honduras ranks 20th and Syrian Arab Republic ranks 23rd of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.