Dealing with construction permits: Cost in Syrian Arab Republic

Syrian Arab Republic: Dealing with construction permits: Cost was 9.6% in 2012. ▼ Falling

Latest (2012)
9.6%
Change on year
down 4.0%
World rank
23rd
of 188 countries
All-time high
19.5%
in 2007
All-time low
9.6%
in 2012
Years of data
8
2005–2012

Dealing with construction permits: Cost in Syrian Arab Republic, 2005–2012

051015202005200820122005: 17.9 % of Warehouse value2006: 14.8 % of Warehouse value2007: 19.5 % of Warehouse value2008: 13.6 % of Warehouse value2009: 10.6 % of Warehouse value2010: 11.1 % of Warehouse value2011: 10 % of Warehouse value2012: 9.6 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

The most recent figure for dealing with construction permits: cost in Syrian Arab Republic is 9.6%, measured in 2012. That is the lowest value across all 8 years on record.

The figure is down 4.0% on the previous year and down 46.4% over ten years.

That places Syrian Arab Republic 23rd out of 188 countries with data for 2012, putting it in the top quarter.

Dealing with construction permits: Cost in Syrian Arab Republic, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) in Syrian Arab Republic, 2005 to 2012.
Year % of Warehouse value Change
2005 17.9%
2006 14.8% -17.3%
2007 19.5% +31.8%
2008 13.6% -30.3%
2009 10.6% -22.1%
2010 11.1% +4.7%
2011 10.0% -9.9%
2012 9.6% -4.0%

Averages by decade

DecadeAverage LowestHighest Years
2000s 15.3% 10.6% 19.5% 5
2010s 10.2% 9.6% 11.1% 3

Countries ranked near Syrian Arab Republic

  1. 20 Honduras 11.4% compare
  2. 20 Rwanda 11.4% compare
  3. 22 Lesotho 11.3% compare
  4. 23 Togo 9.6% compare
  5. 25 Mexico 9.5% compare
  6. 26 Vanuatu 9.4% compare

See the full ranking of 188 places →

More private sector data for Syrian Arab Republic

All data for Syrian Arab Republic →

Frequently asked questions

What is dealing with construction permits: cost in Syrian Arab Republic?
Dealing with construction permits: cost in Syrian Arab Republic was 9.6% in 2012, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Syrian Arab Republic?
The highest recorded value was 19.5% in 2007.
What is the lowest dealing with construction permits: cost recorded in Syrian Arab Republic?
The lowest recorded value was 9.6% in 2012.
How does Syrian Arab Republic rank for dealing with construction permits: cost?
Syrian Arab Republic ranks 23rd out of 188 countries with data for 2012.
Is dealing with construction permits: cost rising or falling in Syrian Arab Republic?
Over the last ten years it is down 46.4%. The long-run trend across the full record is falling.
Where does this Syrian Arab Republic data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Syrian Arab Republic. Statizoid. Retrieved 25 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/syrian-arab-republic/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/syrian-arab-republic/">Dealing with construction permits: Cost in Syrian Arab Republic</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.