Ireland vs Republic of Korea: Dealing with construction permits: Cost

Ireland
4.1%
in 2019
Republic of Korea
4.4%
in 2019
Ireland rank
65th
Republic of Korea rank
63rd

Dealing with construction permits: Cost over time

  • Ireland
  • Republic of Korea
4681012200520122019

How they compare

Republic of Korea currently reports 4.4% against 4.1% in Ireland, a difference of 0.3%.

That makes Republic of Korea's figure about 1.1 times Ireland's.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Ireland ahead.

Ireland ranks 65th and Republic of Korea ranks 63rd of 188 countries.

Ireland has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Ireland Republic of Korea Difference Ahead
2000s 10.2% 4.4% 5.7% Ireland
2010s 7.7% 4.3% 3.3% Ireland

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Ireland or Republic of Korea?
Republic of Korea, at 4.4% against 4.1% in Ireland as of 2019.
What is the difference in dealing with construction permits: cost between Ireland and Republic of Korea?
0.3%, with Republic of Korea ahead.
How many years of comparable data are there for Ireland and Republic of Korea?
15 years are reported by both, from 2005 to 2019.
How do Ireland and Republic of Korea rank globally for dealing with construction permits: cost?
Ireland ranks 65th and Republic of Korea ranks 63rd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Ireland vs Republic of Korea: Dealing with construction permits: Cost. Statizoid. Retrieved 30 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/ireland/korea-rep/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/ireland/korea-rep/">Ireland vs Republic of Korea: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.