Dealing with construction permits: Cost in Ireland

Ireland: Dealing with construction permits: Cost was 4.1% in 2019. ▼ Falling

Latest (2019)
4.1%
Change on year
up 2.5%
World rank
64th
of 187 countries
All-time high
12.5%
in 2012
All-time low
4.0%
in 2018
Years of data
15
2005–2019

Dealing with construction permits: Cost in Ireland, 2005–2019

46810122005201220192005: 11.4 % of Warehouse value2006: 10.8 % of Warehouse value2007: 9.6 % of Warehouse value2008: 9.5 % of Warehouse value2009: 9.6 % of Warehouse value2010: 11.8 % of Warehouse value2011: 12.3 % of Warehouse value2012: 12.5 % of Warehouse value2013: 8.9 % of Warehouse value2014: 7.3 % of Warehouse value2015: 6.2 % of Warehouse value2016: 5.1 % of Warehouse value2017: 4.4 % of Warehouse value2018: 4 % of Warehouse value2019: 4.1 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

Ireland recorded 4.1% for dealing with construction permits: cost in 2019.

That represents a change of up 2.5% on the previous year and down 57.3% over ten years.

Over the whole period, dealing with construction permits: cost in Ireland peaked at 12.5% in 2012 and was at its lowest, 4.0%, in 2018.

That places Ireland 64th out of 187 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Cost in Ireland, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) in Ireland, 2005 to 2019.
Year % of Warehouse value Change
2005 11.4%
2006 10.8% -5.3%
2007 9.6% -11.1%
2008 9.5% -1.0%
2009 9.6% +1.1%
2010 11.8% +22.9%
2011 12.3% +4.2%
2012 12.5% +1.6%
2013 8.9% -28.8%
2014 7.3% -18.0%
2015 6.2% -15.1%
2016 5.1% -17.7%
2017 4.4% -13.7%
2018 4.0% -9.1%
2019 4.1% +2.5%

Averages by decade

DecadeAverage LowestHighest Years
2000s 10.2% 9.5% 11.4% 5
2010s 7.7% 4.0% 12.5% 10

Countries ranked near Ireland

  1. 61 Indonesia 4.5% compare
  2. 62 Republic of Korea 4.4% compare
  3. 62 Ukraine 4.4% compare
  4. 64 Equatorial Guinea 4.1% compare
  5. 66 India 4.0% compare
  6. 66 Nigeria 4.0% compare

See the full ranking of 187 places →

More private sector data for Ireland

All data for Ireland →

Frequently asked questions

What is dealing with construction permits: cost in Ireland?
Dealing with construction permits: cost in Ireland was 4.1% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Ireland?
The highest recorded value was 12.5% in 2012.
What is the lowest dealing with construction permits: cost recorded in Ireland?
The lowest recorded value was 4.0% in 2018.
How does Ireland rank for dealing with construction permits: cost?
Ireland ranks 64th out of 187 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Ireland?
Over the last ten years it is down 57.3%. The long-run trend across the full record is falling.
Where does this Ireland data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Ireland. Statizoid. Retrieved 22 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/ireland/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/ireland/">Dealing with construction permits: Cost in Ireland</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.