Jordan vs Zimbabwe: Dealing with construction permits: Cost

Jordan
12.1%
in 2019
Zimbabwe
12.6%
in 2019
Jordan rank
17th
Zimbabwe rank
15th

Dealing with construction permits: Cost over time

  • Jordan
  • Zimbabwe
0102030200520122019

How they compare

Zimbabwe currently reports 12.6% against 12.1% in Jordan, a difference of 0.5%.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Jordan ahead.

Jordan ranks 17th and Zimbabwe ranks 15th of 188 countries.

Across the 2 decades both report, Jordan averaged higher in 1 and Zimbabwe in 1.

Head to head by decade

Decade Jordan Zimbabwe Difference Ahead
2000s 16.9% 5.6% 11.3% Jordan
2010s 10.2% 21.7% 11.6% Zimbabwe

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Jordan or Zimbabwe?
Zimbabwe, at 12.6% against 12.1% in Jordan as of 2019.
What is the difference in dealing with construction permits: cost between Jordan and Zimbabwe?
0.5%, with Zimbabwe ahead.
How many years of comparable data are there for Jordan and Zimbabwe?
15 years are reported by both, from 2005 to 2019.
How do Jordan and Zimbabwe rank globally for dealing with construction permits: cost?
Jordan ranks 17th and Zimbabwe ranks 15th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Jordan vs Zimbabwe: Dealing with construction permits: Cost. Statizoid. Retrieved 26 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/jordan/zimbabwe/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/jordan/zimbabwe/">Jordan vs Zimbabwe: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.