Dealing with construction permits: Cost in Zimbabwe

Zimbabwe: Dealing with construction permits: Cost was 12.6% in 2019. β—† Volatile

Latest (2019)
12.6%
Change on year
down 44.5%
World rank
15th
of 187 countries
All-time high
28.8%
in 2013
All-time low
2.8%
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Cost in Zimbabwe, 2005–2019

01020302005201220192005: 2.8 % of Warehouse value2006: 2.8 % of Warehouse value2007: 2.8 % of Warehouse value2008: 2.8 % of Warehouse value2009: 17 % of Warehouse value2010: 14.8 % of Warehouse value2011: 11.4 % of Warehouse value2012: 28.1 % of Warehouse value2013: 28.8 % of Warehouse value2014: 25.7 % of Warehouse value2015: 25.2 % of Warehouse value2016: 25.4 % of Warehouse value2017: 22.5 % of Warehouse value2018: 22.7 % of Warehouse value2019: 12.6 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

The most recent figure for dealing with construction permits: cost in Zimbabwe is 12.6%, measured in 2019.

That represents a change of down 44.5% on the previous year and down 25.9% over ten years.

Over the whole period, dealing with construction permits: cost in Zimbabwe peaked at 28.8% in 2013 and was at its lowest, 2.8%, in 2005.

Zimbabwe ranks 15th of 187 countries on this measure, in the top 10%.

The series is highly variable year to year, so single readings are best treated with caution.

Averages by decade

DecadeAverage LowestHighest Years
2000s 5.6% 2.8% 17.0% 5
2010s 21.7% 11.4% 28.8% 10

Countries ranked near Zimbabwe

  1. 12 Cameroon 17.6% compare
  2. 13 Congo, Democratic Republic of the 13.8% compare
  3. 14 Palestine, State of 12.7% compare
  4. 15 Ethiopia, The Federal Democratic Republic of 12.6% compare
  5. 17 Burundi 12.1% compare
  6. 17 Jordan 12.1% compare

See the full ranking of 187 places β†’

More private sector data for Zimbabwe

All data for Zimbabwe β†’

Frequently asked questions

What is dealing with construction permits: cost in Zimbabwe?
Dealing with construction permits: cost in Zimbabwe was 12.6% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Zimbabwe?
The highest recorded value was 28.8% in 2013.
What is the lowest dealing with construction permits: cost recorded in Zimbabwe?
The lowest recorded value was 2.8% in 2005.
How does Zimbabwe rank for dealing with construction permits: cost?
Zimbabwe ranks 15th out of 187 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Zimbabwe?
Over the last ten years it is down 25.9%. The long-run trend across the full record is volatile.
Where does this Zimbabwe data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV Β· JSON β€” 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Zimbabwe. Statizoid. Retrieved 19 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/zimbabwe/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/zimbabwe/">Dealing with construction permits: Cost in Zimbabwe</a> β€” Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.