Kosovo vs Kuwait: Dealing with construction permits: Cost

Kosovo
5.2%
in 2019
Kuwait
5.5%
in 2019
Kosovo rank
54th
Kuwait rank
52nd

Dealing with construction permits: Cost over time

  • Kosovo
  • Kuwait
020406080200520122019

How they compare

Kuwait currently reports 5.5% against 5.2% in Kosovo, a difference of 0.3%.

That makes Kuwait's figure about 1.1 times Kosovo's.

The two have swapped places 3 times across 11 shared years of data; in 2009 it was Kosovo ahead.

Kosovo ranks 54th and Kuwait ranks 52nd of 188 countries.

Kosovo has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Kosovo Kuwait Difference Ahead
2000s 65.6% 5.1% 60.5% Kosovo
2010s 24.3% 5.7% 18.6% Kosovo

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Kosovo or Kuwait?
Kuwait, at 5.5% against 5.2% in Kosovo as of 2019.
What is the difference in dealing with construction permits: cost between Kosovo and Kuwait?
0.3%, with Kuwait ahead.
How many years of comparable data are there for Kosovo and Kuwait?
11 years are reported by both, from 2009 to 2019.
How do Kosovo and Kuwait rank globally for dealing with construction permits: cost?
Kosovo ranks 54th and Kuwait ranks 52nd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Kosovo vs Kuwait: Dealing with construction permits: Cost. Statizoid. Retrieved 26 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/kosovo/kuwait/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/kosovo/kuwait/">Kosovo vs Kuwait: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.