Dealing with construction permits: Cost in Kosovo

Kosovo: Dealing with construction permits: Cost was 5.2% in 2019. ◆ Volatile

Latest (2019)
5.2%
Change on year
down 3.7%
World rank
54th
of 187 countries
All-time high
71.3%
in 2010
All-time low
5.2%
in 2019
Years of data
11
2009–2019

Dealing with construction permits: Cost in Kosovo, 2009–2019

0204060802009201420192009: 65.6 % of Warehouse value2010: 71.3 % of Warehouse value2011: 66.3 % of Warehouse value2012: 59.7 % of Warehouse value2013: 10.3 % of Warehouse value2014: 6.7 % of Warehouse value2015: 6.4 % of Warehouse value2016: 6.1 % of Warehouse value2017: 5.8 % of Warehouse value2018: 5.4 % of Warehouse value2019: 5.2 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

In 2019, dealing with construction permits: cost in Kosovo stood at 5.2%. That is the lowest value across all 11 years on record.

Compared with earlier readings it is down 3.7% on the previous year and down 92.1% over ten years.

Over the whole period, dealing with construction permits: cost in Kosovo peaked at 71.3% in 2010 and was at its lowest, 5.2%, in 2019.

Kosovo ranks 54th of 187 countries on this measure, in the middle of the range.

The series is highly variable year to year, so single readings are best treated with caution.

Dealing with construction permits: Cost in Kosovo, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) in Kosovo, 2009 to 2019.
Year % of Warehouse value Change
2009 65.6%
2010 71.3% +8.7%
2011 66.3% -7.0%
2012 59.7% -10.0%
2013 10.3% -82.7%
2014 6.7% -35.0%
2015 6.4% -4.5%
2016 6.1% -4.7%
2017 5.8% -4.9%
2018 5.4% -6.9%
2019 5.2% -3.7%

Averages by decade

DecadeAverage LowestHighest Years
2000s 65.6% 65.6% 65.6% 1
2010s 24.3% 5.2% 71.3% 10

Countries ranked near Kosovo

  1. 52 Kuwait 5.5% compare
  2. 53 Tanzania, United Republic of 5.4% compare
  3. 55 Montenegro 4.9% compare
  4. 56 Benin 4.8% compare
  5. 56 Djibouti 4.8% compare
  6. 56 Mauritania 4.8% compare

See the full ranking of 187 places →

More private sector data for Kosovo

All data for Kosovo →

Frequently asked questions

What is dealing with construction permits: cost in Kosovo?
Dealing with construction permits: cost in Kosovo was 5.2% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Kosovo?
The highest recorded value was 71.3% in 2010.
What is the lowest dealing with construction permits: cost recorded in Kosovo?
The lowest recorded value was 5.2% in 2019.
How does Kosovo rank for dealing with construction permits: cost?
Kosovo ranks 54th out of 187 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Kosovo?
Over the last ten years it is down 92.1%. The long-run trend across the full record is volatile.
Where does this Kosovo data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 11 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Kosovo. Statizoid. Retrieved 23 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/kosovo/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/kosovo/">Dealing with construction permits: Cost in Kosovo</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.