Kuwait vs Tanzania, United Republic of: Dealing with construction permits: Cost

Kuwait
5.5%
in 2019
Tanzania, United Republic of
5.4%
in 2019
Kuwait rank
52nd
Tanzania, United Republic of rank
53rd

Dealing with construction permits: Cost over time

  • Kuwait
  • Tanzania, United Republic of
5101520200520122019

How they compare

Kuwait currently reports 5.5% against 5.4% in Tanzania, United Republic of, a difference of 0.1%.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Tanzania, United Republic of ahead.

Kuwait ranks 52nd and Tanzania, United Republic of ranks 53rd of 188 countries.

Tanzania, United Republic of has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Kuwait Tanzania, United Republic of Difference Ahead
2000s 8.1% 16.2% 8.1% Tanzania, United Republic of
2010s 5.7% 8.7% 3.1% Tanzania, United Republic of

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Kuwait or Tanzania, United Republic of?
Kuwait, at 5.5% against 5.4% in Tanzania, United Republic of as of 2019.
What is the difference in dealing with construction permits: cost between Kuwait and Tanzania, United Republic of?
0.1%, with Kuwait ahead.
How many years of comparable data are there for Kuwait and Tanzania, United Republic of?
15 years are reported by both, from 2005 to 2019.
How do Kuwait and Tanzania, United Republic of rank globally for dealing with construction permits: cost?
Kuwait ranks 52nd and Tanzania, United Republic of ranks 53rd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Kuwait vs Tanzania, United Republic of: Dealing with construction permits: Cost. Statizoid. Retrieved 27 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/kuwait/tanzania/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/kuwait/tanzania/">Kuwait vs Tanzania, United Republic of: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.