Dealing with construction permits: Cost (% of Warehouse value) in Tanzania

Tanzania: Dealing with construction permits: Cost (% of Warehouse value) was 5.4% in 2019. ▼ Falling

Latest (2019)
5.4%
Change on year
down 10.0%
World rank
53rd
of 188 countries
All-time high
20.5%
in 2005
All-time low
5.4%
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Cost in Tanzania, 2005–2019

51015202005201220192005: 20.5 % of Warehouse value2006: 18.9 % of Warehouse value2007: 15.7 % of Warehouse value2008: 13.8 % of Warehouse value2009: 12.3 % of Warehouse value2010: 10.3 % of Warehouse value2011: 9.5 % of Warehouse value2012: 12.4 % of Warehouse value2013: 10.8 % of Warehouse value2014: 11.1 % of Warehouse value2015: 7.9 % of Warehouse value2016: 7.4 % of Warehouse value2017: 6.6 % of Warehouse value2018: 6 % of Warehouse value2019: 5.4 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

The most recent figure for dealing with construction permits: cost in Tanzania is 5.4%, measured in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 10.0% on the previous year and down 56.1% over ten years.

Over the whole period, dealing with construction permits: cost in Tanzania peaked at 20.5% in 2005 and was at its lowest, 5.4%, in 2019.

That places Tanzania 53rd out of 188 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Cost (% of Warehouse value) in Tanzania, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) in Tanzania, 2005 to 2019.
Year % of Warehouse value Change
2005 20.5% —
2006 18.9% -7.8%
2007 15.7% -16.9%
2008 13.8% -12.1%
2009 12.3% -10.9%
2010 10.3% -16.3%
2011 9.5% -7.8%
2012 12.4% +30.5%
2013 10.8% -12.9%
2014 11.1% +2.8%
2015 7.9% -28.8%
2016 7.4% -6.3%
2017 6.6% -10.8%
2018 6.0% -9.1%
2019 5.4% -10.0%

Tanzania compared with similar countries

  • Tanzania's 5.4% is above the median for lower middle income countries, which is 4.6%, 1.2× the median. (47 countries reporting)
  • Tanzania's 5.4% is below the median for Sub-Saharan Africa, which is 6.7%, 81% of the median. (46 countries reporting)

Biggest year-on-year movements

Years where Dealing with construction permits: Cost (% of Warehouse value) in Tanzania changed far more than this series normally does. A large move can be a real event or a change in how the figure was measured — the source note below says who published it.

YearChange FromTo
2012 +30.5% 9.5% 12.4%

Averages by decade

DecadeAverage LowestHighest Years
2000s 16.2% 12.3% 20.5% 5
2010s 8.7% 5.4% 12.4% 10

Countries ranked near Tanzania

  1. 50 Nicaragua 5.7% compare
  2. 50 Tonga 5.7% compare
  3. 52 Kuwait 5.5% compare
  4. 54 Kosovo 5.2% compare
  5. 54 Kosovo (UNSCR 1244) 5.2% compare
  6. 56 Montenegro 4.9% compare

See the full ranking of 188 places →

More private sector data for Tanzania

All data for Tanzania →

Frequently asked questions

What is dealing with construction permits: cost in Tanzania?
Dealing with construction permits: cost in Tanzania was 5.4% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Tanzania?
The highest recorded value was 20.5% in 2005.
What is the lowest dealing with construction permits: cost recorded in Tanzania?
The lowest recorded value was 5.4% in 2019.
How does Tanzania rank for dealing with construction permits: cost?
Tanzania ranks 53rd out of 188 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Tanzania?
Over the last ten years it is down 56.1%. The long-run trend across the full record is falling.
Where does this Tanzania data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Tanzania. Statizoid. Retrieved 08 November 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/tanzania/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/tanzania/">Dealing with construction permits: Cost in Tanzania</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.