Lesotho
11.3%
in 2019
Mexico
9.5%
in 2019
Lesotho rank
22nd
Mexico rank
25th

Dealing with construction permits: Cost over time

  • Lesotho
  • Mexico
5101520200520122019

How they compare

Lesotho currently reports 11.3% against 9.5% in Mexico, a difference of 1.8%.

That makes Lesotho's figure about 1.2 times Mexico's.

Across all 15 years both countries report, Lesotho has been ahead every year.

Lesotho ranks 22nd and Mexico ranks 25th of 187 countries.

Lesotho has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Lesotho Mexico Difference Ahead
2000s 14.2% 10.4% 3.9% Lesotho
2010s 15.6% 9.5% 6.1% Lesotho

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Lesotho or Mexico?
Lesotho, at 11.3% against 9.5% in Mexico as of 2019.
What is the difference in dealing with construction permits: cost between Lesotho and Mexico?
1.8%, with Lesotho ahead.
How many years of comparable data are there for Lesotho and Mexico?
15 years are reported by both, from 2005 to 2019.
How do Lesotho and Mexico rank globally for dealing with construction permits: cost?
Lesotho ranks 22nd and Mexico ranks 25th of 187 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Lesotho vs Mexico: Dealing with construction permits: Cost. Statizoid. Retrieved 22 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/lesotho/mexico/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/lesotho/mexico/">Lesotho vs Mexico: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.