Dealing with construction permits: Cost in Lesotho

Lesotho: Dealing with construction permits: Cost was 11.3% in 2019. β–Ό Falling

Latest (2019)
11.3%
Change on year
down 7.4%
World rank
22nd
of 187 countries
All-time high
22.0%
in 2010
All-time low
11.3%
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Cost in Lesotho, 2005–2019

051015202005201220192005: 13.3 % of Warehouse value2006: 12.7 % of Warehouse value2007: 11.6 % of Warehouse value2008: 11.8 % of Warehouse value2009: 21.8 % of Warehouse value2010: 22 % of Warehouse value2011: 20.4 % of Warehouse value2012: 18.9 % of Warehouse value2013: 16.6 % of Warehouse value2014: 14.5 % of Warehouse value2015: 14.3 % of Warehouse value2016: 12.5 % of Warehouse value2017: 13 % of Warehouse value2018: 12.2 % of Warehouse value2019: 11.3 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

Lesotho recorded 11.3% for dealing with construction permits: cost in 2019. That is the lowest value across all 15 years on record.

The figure is down 7.4% on the previous year and down 48.2% over ten years.

Over the whole period, dealing with construction permits: cost in Lesotho peaked at 22.0% in 2010 and was at its lowest, 11.3%, in 2019.

Lesotho ranks 22nd of 187 countries on this measure, in the top quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 14.2% 11.6% 21.8% 5
2010s 15.6% 11.3% 22.0% 10

Countries ranked near Lesotho

  1. 19 Venezuela 12.0% compare
  2. 20 Honduras 11.4% compare
  3. 20 Rwanda 11.4% compare
  4. 23 Syria 9.6% compare
  5. 23 Togo 9.6% compare
  6. 25 Mexico 9.5% compare

See the full ranking of 187 places β†’

More private sector data for Lesotho

All data for Lesotho β†’

Frequently asked questions

What is dealing with construction permits: cost in Lesotho?
Dealing with construction permits: cost in Lesotho was 11.3% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Lesotho?
The highest recorded value was 22.0% in 2010.
What is the lowest dealing with construction permits: cost recorded in Lesotho?
The lowest recorded value was 11.3% in 2019.
How does Lesotho rank for dealing with construction permits: cost?
Lesotho ranks 22nd out of 187 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Lesotho?
Over the last ten years it is down 48.2%. The long-run trend across the full record is falling.
Where does this Lesotho data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV Β· JSON β€” 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Lesotho. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/lesotho/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/lesotho/">Dealing with construction permits: Cost in Lesotho</a> β€” Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.