Lithuania vs Suriname: Dealing with construction permits: Cost
Dealing with construction permits: Cost over time
- Lithuania
- Suriname
How they compare
Lithuania currently reports 0.3% against 0.3% in Suriname, a difference of 0.0%.
The two have swapped places 2 times across 15 shared years of data; in 2005 it was Suriname ahead.
Lithuania ranks 172nd and Suriname ranks 172nd of 188 countries.
Across the 2 decades both report, Lithuania averaged higher in 1 and Suriname in 1.
Head to head by decade
| Decade | Lithuania | Suriname | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0.4% | 0.5% | 0.1% | Suriname |
| 2010s | 0.3% | 0.2% | 0.1% | Lithuania |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: cost, Lithuania or Suriname?
- Lithuania, at 0.3% against 0.3% in Suriname as of 2019.
- What is the difference in dealing with construction permits: cost between Lithuania and Suriname?
- 0.0%, with Lithuania ahead.
- How many years of comparable data are there for Lithuania and Suriname?
- 15 years are reported by both, from 2005 to 2019.
- How do Lithuania and Suriname rank globally for dealing with construction permits: cost?
- Lithuania ranks 172nd and Suriname ranks 172nd of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.