Dealing with construction permits: Cost (% of Warehouse value) in Suriname

Suriname: Dealing with construction permits: Cost (% of Warehouse value) was 0.3% in 2019. ◆ Volatile

Latest (2019)
0.3%
Change on year
up 50.0%
World rank
172nd
of 188 countries
All-time high
0.7%
in 2005
All-time low
0.2%
in 2011
Years of data
15
2005–2019

Dealing with construction permits: Cost in Suriname, 2005–2019

0.20.30.40.50.60.72005201220192005: 0.7 % of Warehouse value2006: 0.7 % of Warehouse value2007: 0.5 % of Warehouse value2008: 0.4 % of Warehouse value2009: 0.3 % of Warehouse value2010: 0.3 % of Warehouse value2011: 0.2 % of Warehouse value2012: 0.2 % of Warehouse value2013: 0.2 % of Warehouse value2014: 0.2 % of Warehouse value2015: 0.2 % of Warehouse value2016: 0.2 % of Warehouse value2017: 0.2 % of Warehouse value2018: 0.2 % of Warehouse value2019: 0.3 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

In 2019, dealing with construction permits: cost in Suriname stood at 0.3%.

Compared with earlier readings it is up 50.0% on the previous year and unchanged over ten years.

Over the whole period, dealing with construction permits: cost in Suriname peaked at 0.7% in 2005 and was at its lowest, 0.2%, in 2011.

Suriname ranks 172nd of 188 countries on this measure, in the bottom quarter.

The series is highly variable year to year, so single readings are best treated with caution.

Dealing with construction permits: Cost (% of Warehouse value) in Suriname, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) in Suriname, 2005 to 2019.
Year % of Warehouse value Change
2005 0.7% —
2006 0.7% +0.0%
2007 0.5% -28.6%
2008 0.4% -20.0%
2009 0.3% -25.0%
2010 0.3% +0.0%
2011 0.2% -33.3%
2012 0.2% +0.0%
2013 0.2% +0.0%
2014 0.2% +0.0%
2015 0.2% +0.0%
2016 0.2% +0.0%
2017 0.2% +0.0%
2018 0.2% +0.0%
2019 0.3% +50.0%

Suriname compared with similar countries

  • Suriname's 0.3% is below the median for upper middle income countries, which is 1.8%, 17% of the median. (55 countries reporting)
  • Suriname's 0.3% is below the median for Latin America & Caribbean, which is 1.8%, 17% of the median. (33 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 0.5% 0.3% 0.7% 5
2010s 0.2% 0.2% 0.3% 10

Countries ranked near Suriname

  1. 172 Dominica 0.3% compare
  2. 172 Georgia 0.3% compare
  3. 172 Hong Kong 0.3% compare
  4. 172 Iraq 0.3% compare
  5. 172 Lithuania 0.3% compare
  6. 172 Poland 0.3% compare
  7. 172 Seychelles 0.3% compare
  8. 172 Sri Lanka 0.3% compare

See the full ranking of 188 places →

More private sector data for Suriname

All data for Suriname →

Frequently asked questions

What is dealing with construction permits: cost in Suriname?
Dealing with construction permits: cost in Suriname was 0.3% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Suriname?
The highest recorded value was 0.7% in 2005.
What is the lowest dealing with construction permits: cost recorded in Suriname?
The lowest recorded value was 0.2% in 2011.
How does Suriname rank for dealing with construction permits: cost?
Suriname ranks 172nd out of 188 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Suriname?
Over the last ten years it is unchanged. The long-run trend across the full record is volatile.
Where does this Suriname data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Suriname. Statizoid. Retrieved 07 November 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/suriname/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/suriname/">Dealing with construction permits: Cost in Suriname</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.