Luxembourg vs United States of America: Dealing with construction permits: Cost

Luxembourg
0.7%
in 2019
United States of America
0.7%
in 2019
Luxembourg rank
150th
United States of America rank
150th

Dealing with construction permits: Cost over time

  • Luxembourg
  • United States of America
0.20.40.60.811.2200520122019

How they compare

Luxembourg currently reports 0.7% against 0.7% in United States of America, a difference of 0.0%.

The two have swapped places 1 time across 14 shared years of data; in 2006 it was Luxembourg ahead.

Luxembourg ranks 150th and United States of America ranks 150th of 188 countries.

Across the 2 decades both report, Luxembourg averaged higher in 1 and United States of America in 1.

Head to head by decade

Decade Luxembourg United States of America Difference Ahead
2000s 0.7% 0.3% 0.4% Luxembourg
2010s 0.7% 0.7% 0.0% United States of America

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Luxembourg or United States of America?
Luxembourg, at 0.7% against 0.7% in United States of America as of 2019.
What is the difference in dealing with construction permits: cost between Luxembourg and United States of America?
0.0%, with Luxembourg ahead.
How many years of comparable data are there for Luxembourg and United States of America?
14 years are reported by both, from 2006 to 2019.
How do Luxembourg and United States of America rank globally for dealing with construction permits: cost?
Luxembourg ranks 150th and United States of America ranks 150th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Luxembourg vs United States of America: Dealing with construction permits: Cost. Statizoid. Retrieved 05 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/luxembourg/united-states/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/luxembourg/united-states/">Luxembourg vs United States of America: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.