Dealing with construction permits: Cost in Luxembourg

Luxembourg: Dealing with construction permits: Cost was 0.7% in 2019. ▬ Flat

Latest (2019)
0.7%
Change on year
unchanged
World rank
149th
of 187 countries
All-time high
0.7%
in 2006
All-time low
0.7%
in 2006
Years of data
14
2006–2019

Dealing with construction permits: Cost in Luxembourg, 2006–2019

00.20.40.62006201220192006: 0.7 % of Warehouse value2007: 0.7 % of Warehouse value2008: 0.7 % of Warehouse value2009: 0.7 % of Warehouse value2010: 0.7 % of Warehouse value2011: 0.7 % of Warehouse value2012: 0.7 % of Warehouse value2013: 0.7 % of Warehouse value2014: 0.7 % of Warehouse value2015: 0.7 % of Warehouse value2016: 0.7 % of Warehouse value2017: 0.7 % of Warehouse value2018: 0.7 % of Warehouse value2019: 0.7 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

In 2019, dealing with construction permits: cost in Luxembourg stood at 0.7%. That is the highest value across all 14 years on record.

That represents a change of unchanged over ten years.

Over the whole period, dealing with construction permits: cost in Luxembourg peaked at 0.7% in 2006 and was at its lowest, 0.7%, in 2006.

That places Luxembourg 149th out of 187 countries with data for 2019, putting it in the bottom quarter.

Dealing with construction permits: Cost in Luxembourg, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) in Luxembourg, 2006 to 2019.
Year % of Warehouse value Change
2006 0.7%
2007 0.7% +0.0%
2008 0.7% +0.0%
2009 0.7% +0.0%
2010 0.7% +0.0%
2011 0.7% +0.0%
2012 0.7% +0.0%
2013 0.7% +0.0%
2014 0.7% +0.0%
2015 0.7% +0.0%
2016 0.7% +0.0%
2017 0.7% +0.0%
2018 0.7% +0.0%
2019 0.7% +0.0%

Averages by decade

DecadeAverage LowestHighest Years
2000s 0.7% 0.7% 0.7% 4
2010s 0.7% 0.7% 0.7% 10

Countries ranked near Luxembourg

  1. 146 Bahamas 0.8% compare
  2. 146 Oman 0.8% compare
  3. 146 Samoa 0.8% compare
  4. 149 United States of America 0.7% compare
  5. 149 Finland 0.7% compare
  6. 149 Switzerland 0.7% compare

See the full ranking of 187 places →

More private sector data for Luxembourg

All data for Luxembourg →

Frequently asked questions

What is dealing with construction permits: cost in Luxembourg?
Dealing with construction permits: cost in Luxembourg was 0.7% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Luxembourg?
The highest recorded value was 0.7% in 2006.
What is the lowest dealing with construction permits: cost recorded in Luxembourg?
The lowest recorded value was 0.7% in 2006.
How does Luxembourg rank for dealing with construction permits: cost?
Luxembourg ranks 149th out of 187 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Luxembourg?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Luxembourg data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 14 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Luxembourg. Statizoid. Retrieved 22 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/luxembourg/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/luxembourg/">Dealing with construction permits: Cost in Luxembourg</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.