Madagascar vs Niger: Dealing with construction permits: Cost

Madagascar
35.2%
in 2019
Niger
32.4%
in 2019
Madagascar rank
2nd
Niger rank
3rd

Dealing with construction permits: Cost over time

  • Madagascar
  • Niger
406080100120200520122019

How they compare

Madagascar currently reports 35.2% against 32.4% in Niger, a difference of 2.8%.

That makes Madagascar's figure about 1.1 times Niger's.

Across all 15 years both countries report, Madagascar has been ahead every year.

Madagascar ranks 2nd and Niger ranks 3rd of 187 countries.

Madagascar has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Madagascar Niger Difference Ahead
2000s 97.0% 55.9% 41.2% Madagascar
2010s 59.9% 40.0% 19.9% Madagascar

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Madagascar or Niger?
Madagascar, at 35.2% against 32.4% in Niger as of 2019.
What is the difference in dealing with construction permits: cost between Madagascar and Niger?
2.8%, with Madagascar ahead.
How many years of comparable data are there for Madagascar and Niger?
15 years are reported by both, from 2005 to 2019.
How do Madagascar and Niger rank globally for dealing with construction permits: cost?
Madagascar ranks 2nd and Niger ranks 3rd of 187 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Madagascar vs Niger: Dealing with construction permits: Cost. Statizoid. Retrieved 22 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/madagascar/niger/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/madagascar/niger/">Madagascar vs Niger: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.