Niger: Dealing with construction permits: Cost was 32.4% in 2019. β–Ό Falling

Latest (2019)
32.4%
Change on year
down 2.4%
World rank
3rd
of 187 countries
All-time high
60.2%
in 2006
All-time low
32.4%
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Cost in Niger, 2005–2019

02040602005201220192005: 58.9 % of Warehouse value2006: 60.2 % of Warehouse value2007: 57.1 % of Warehouse value2008: 54.7 % of Warehouse value2009: 48.4 % of Warehouse value2010: 48.4 % of Warehouse value2011: 46.3 % of Warehouse value2012: 45.5 % of Warehouse value2013: 42.3 % of Warehouse value2014: 39.7 % of Warehouse value2015: 37.7 % of Warehouse value2016: 38.8 % of Warehouse value2017: 35.3 % of Warehouse value2018: 33.2 % of Warehouse value2019: 32.4 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

In 2019, dealing with construction permits: cost in Niger stood at 32.4%. That is the lowest value across all 15 years on record.

The figure is down 2.4% on the previous year and down 33.1% over ten years.

Over the whole period, dealing with construction permits: cost in Niger peaked at 60.2% in 2006 and was at its lowest, 32.4%, in 2019.

Niger ranks 3rd of 187 countries on this measure, in the top 10%.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 55.9% 48.4% 60.2% 5
2010s 40.0% 32.4% 48.4% 10

Countries ranked near Niger

  1. 1 Afghanistan, Islamic Republic of 75.6% compare
  2. 2 Madagascar, Republic of 35.2% compare
  3. 4 Liberia 24.1% compare
  4. 5 Guinea-Bissau 23.7% compare
  5. 6 Central African Republic 23.2% compare

See the full ranking of 187 places β†’

More private sector data for Niger

All data for Niger β†’

Frequently asked questions

What is dealing with construction permits: cost in Niger?
Dealing with construction permits: cost in Niger was 32.4% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Niger?
The highest recorded value was 60.2% in 2006.
What is the lowest dealing with construction permits: cost recorded in Niger?
The lowest recorded value was 32.4% in 2019.
How does Niger rank for dealing with construction permits: cost?
Niger ranks 3rd out of 187 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Niger?
Over the last ten years it is down 33.1%. The long-run trend across the full record is falling.
Where does this Niger data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV Β· JSON β€” 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Niger. Statizoid. Retrieved 18 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/niger/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/niger/">Dealing with construction permits: Cost in Niger</a> β€” Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.