Pakistan vs South Sudan: Dealing with construction permits: Cost
Dealing with construction permits: Cost over time
- Pakistan
- South Sudan
How they compare
Pakistan currently reports 8.8% against 8.5% in South Sudan, a difference of 0.3%.
The two have swapped places 1 time across 8 shared years of data; in 2012 it was South Sudan ahead.
Pakistan ranks 30th and South Sudan ranks 32nd of 188 countries.
South Sudan has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: cost, Pakistan or South Sudan?
- Pakistan, at 8.8% against 8.5% in South Sudan as of 2019.
- What is the difference in dealing with construction permits: cost between Pakistan and South Sudan?
- 0.3%, with Pakistan ahead.
- How many years of comparable data are there for Pakistan and South Sudan?
- 8 years are reported by both, from 2012 to 2019.
- How do Pakistan and South Sudan rank globally for dealing with construction permits: cost?
- Pakistan ranks 30th and South Sudan ranks 32nd of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.