Dealing with construction permits: Cost in South Sudan

South Sudan: Dealing with construction permits: Cost was 8.5% in 2019. ▲ Rising

Latest (2019)
8.5%
Change on year
down 28.0%
World rank
32nd
of 188 countries
All-time high
22.5%
in 2017
All-time low
7.0%
in 2012
Years of data
8
2012–2019

Dealing with construction permits: Cost in South Sudan, 2012–2019

5101520252012201520192012: 7 % of Warehouse value2013: 12.2 % of Warehouse value2014: 7.5 % of Warehouse value2015: 9.6 % of Warehouse value2016: 10.1 % of Warehouse value2017: 22.5 % of Warehouse value2018: 11.8 % of Warehouse value2019: 8.5 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

In 2019, dealing with construction permits: cost in South Sudan stood at 8.5%.

The figure is down 28.0% on the previous year and up 21.4% over ten years.

South Sudan ranks 32nd of 188 countries on this measure, in the top quarter.

Dealing with construction permits: Cost in South Sudan, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) in South Sudan, 2012 to 2019.
Year % of Warehouse value Change
2012 7.0%
2013 12.2% +74.3%
2014 7.5% -38.5%
2015 9.6% +28.0%
2016 10.1% +5.2%
2017 22.5% +122.8%
2018 11.8% -47.6%
2019 8.5% -28.0%

Countries ranked near South Sudan

  1. 29 Croatia 9.2% compare
  2. 30 Pakistan 8.8% compare
  3. 31 Nepal 8.6% compare
  4. 33 Malawi 8.4% compare
  5. 34 Kiribati 8.3% compare
  6. 35 Senegal 7.8% compare

See the full ranking of 188 places →

More private sector data for South Sudan

All data for South Sudan →

Frequently asked questions

What is dealing with construction permits: cost in South Sudan?
Dealing with construction permits: cost in South Sudan was 8.5% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in South Sudan?
The highest recorded value was 22.5% in 2017.
What is the lowest dealing with construction permits: cost recorded in South Sudan?
The lowest recorded value was 7.0% in 2012.
How does South Sudan rank for dealing with construction permits: cost?
South Sudan ranks 32nd out of 188 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in South Sudan?
Over the last ten years it is up 21.4%. The long-run trend across the full record is rising.
Where does this South Sudan data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in South Sudan. Statizoid. Retrieved 26 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/south-sudan/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/south-sudan/">Dealing with construction permits: Cost in South Sudan</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.