Rwanda vs Togo: Dealing with construction permits: Cost

Rwanda
11.4%
in 2019
Togo
9.6%
in 2019
Rwanda rank
20th
Togo rank
23rd

Dealing with construction permits: Cost over time

  • Rwanda
  • Togo
1015202530200520122019

How they compare

Rwanda currently reports 11.4% against 9.6% in Togo, a difference of 1.8%.

That makes Rwanda's figure about 1.2 times Togo's.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Rwanda ahead.

Rwanda ranks 20th and Togo ranks 23rd of 188 countries.

Togo has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Rwanda Togo Difference Ahead
2000s 21.2% 25.7% 4.5% Togo
2010s 11.5% 17.4% 6.0% Togo

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Rwanda or Togo?
Rwanda, at 11.4% against 9.6% in Togo as of 2019.
What is the difference in dealing with construction permits: cost between Rwanda and Togo?
1.8%, with Rwanda ahead.
How many years of comparable data are there for Rwanda and Togo?
15 years are reported by both, from 2005 to 2019.
How do Rwanda and Togo rank globally for dealing with construction permits: cost?
Rwanda ranks 20th and Togo ranks 23rd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Rwanda vs Togo: Dealing with construction permits: Cost. Statizoid. Retrieved 25 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/rwanda/togo/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/rwanda/togo/">Rwanda vs Togo: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.