Dealing with construction permits: Cost (% of Warehouse value) in Rwanda

Rwanda: Dealing with construction permits: Cost (% of Warehouse value) was 11.4% in 2019. ▼ Falling

Latest (2019)
11.4%
Change on year
down 5.0%
World rank
20th
of 188 countries
All-time high
26.1%
in 2005
All-time low
8.5%
in 2015
Years of data
15
2005–2019

Dealing with construction permits: Cost in Rwanda, 2005–2019

101520252005201220192005: 26.1 % of Warehouse value2006: 24.7 % of Warehouse value2007: 23.4 % of Warehouse value2008: 17.8 % of Warehouse value2009: 13.9 % of Warehouse value2010: 11.5 % of Warehouse value2011: 10.5 % of Warehouse value2012: 9.6 % of Warehouse value2013: 14.9 % of Warehouse value2014: 9 % of Warehouse value2015: 8.5 % of Warehouse value2016: 14.1 % of Warehouse value2017: 13.2 % of Warehouse value2018: 12 % of Warehouse value2019: 11.4 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

The most recent figure for dealing with construction permits: cost in Rwanda is 11.4%, measured in 2019.

The figure is down 5.0% on the previous year and down 18.0% over ten years.

Over the whole period, dealing with construction permits: cost in Rwanda peaked at 26.1% in 2005 and was at its lowest, 8.5%, in 2015.

That places Rwanda 20th out of 188 countries with data for 2019, putting it in the top quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Cost (% of Warehouse value) in Rwanda, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) in Rwanda, 2005 to 2019.
Year % of Warehouse value Change
2005 26.1% —
2006 24.7% -5.4%
2007 23.4% -5.3%
2008 17.8% -23.9%
2009 13.9% -21.9%
2010 11.5% -17.3%
2011 10.5% -8.7%
2012 9.6% -8.6%
2013 14.9% +55.2%
2014 9.0% -39.6%
2015 8.5% -5.6%
2016 14.1% +65.9%
2017 13.2% -6.4%
2018 12.0% -9.1%
2019 11.4% -5.0%

Rwanda compared with similar countries

  • Rwanda's 11.4% is below the median for low income countries, which is 11.8%, 97% of the median. (22 countries reporting)
  • Rwanda's 11.4% is above the median for Sub-Saharan Africa, which is 6.7%, 1.7× the median. (46 countries reporting)

Biggest year-on-year movements

Years where Dealing with construction permits: Cost (% of Warehouse value) in Rwanda changed far more than this series normally does. A large move can be a real event or a change in how the figure was measured — the source note below says who published it.

YearChange FromTo
2016 +65.9% 8.5% 14.1%
2013 +55.2% 9.6% 14.9%
2014 -39.6% 14.9% 9.0%

Averages by decade

DecadeAverage LowestHighest Years
2000s 21.2% 13.9% 26.1% 5
2010s 11.5% 8.5% 14.9% 10

Countries ranked near Rwanda

  1. 17 Burundi 12.1% compare
  2. 17 Jordan 12.1% compare
  3. 19 Venezuela 12.0% compare
  4. 20 Honduras 11.4% compare
  5. 22 Lesotho 11.3% compare
  6. 23 Syria 9.6% compare
  7. 23 Togo 9.6% compare

See the full ranking of 188 places →

More private sector data for Rwanda

All data for Rwanda →

Frequently asked questions

What is dealing with construction permits: cost in Rwanda?
Dealing with construction permits: cost in Rwanda was 11.4% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Rwanda?
The highest recorded value was 26.1% in 2005.
What is the lowest dealing with construction permits: cost recorded in Rwanda?
The lowest recorded value was 8.5% in 2015.
How does Rwanda rank for dealing with construction permits: cost?
Rwanda ranks 20th out of 188 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Rwanda?
Over the last ten years it is down 18.0%. The long-run trend across the full record is falling.
Where does this Rwanda data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Rwanda. Statizoid. Retrieved 08 November 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/rwanda/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/rwanda/">Dealing with construction permits: Cost in Rwanda</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.