Senegal vs South Sudan: Dealing with construction permits: Cost
Dealing with construction permits: Cost over time
- Senegal
- South Sudan
How they compare
South Sudan currently reports 8.5% against 7.8% in Senegal, a difference of 0.7%.
That makes South Sudan's figure about 1.1 times Senegal's.
The two have swapped places 3 times across 8 shared years of data; in 2012 it was Senegal ahead.
Senegal ranks 35th and South Sudan ranks 32nd of 188 countries.
South Sudan has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: cost, Senegal or South Sudan?
- South Sudan, at 8.5% against 7.8% in Senegal as of 2019.
- What is the difference in dealing with construction permits: cost between Senegal and South Sudan?
- 0.7%, with South Sudan ahead.
- How many years of comparable data are there for Senegal and South Sudan?
- 8 years are reported by both, from 2012 to 2019.
- How do Senegal and South Sudan rank globally for dealing with construction permits: cost?
- Senegal ranks 35th and South Sudan ranks 32nd of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.