Georgia vs United Kingdom: Dealing with construction permits (DB06-15 methodology) - Score

Georgia
87.6
in 2014
United Kingdom
86.82
in 2014
Georgia rank
4th
United Kingdom rank
5th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Georgia
  • United Kingdom
020406080200520092014

How they compare

Georgia currently reports 87.6 against 86.82 in United Kingdom, a difference of 0.78.

The two have swapped places 3 times across 10 shared years of data; in 2005 it was United Kingdom ahead.

Georgia ranks 4th and United Kingdom ranks 5th of 181 countries.

United Kingdom has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Georgia United Kingdom Difference Ahead
2000s 69.83 73.47 3.65 United Kingdom
2010s 84.49 86.61 2.12 United Kingdom

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Georgia or United Kingdom?
Georgia, at 87.6 against 86.82 in United Kingdom as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Georgia and United Kingdom?
0.78, with Georgia ahead.
How many years of comparable data are there for Georgia and United Kingdom?
10 years are reported by both, from 2005 to 2014.
How do Georgia and United Kingdom rank globally for dealing with construction permits (db06-15 methodology) - score?
Georgia ranks 4th and United Kingdom ranks 5th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.