Dealing with construction permits (DB06-15 methodology) - Score in United Kingdom

United Kingdom: Dealing with construction permits (DB06-15 methodology) - Score was 86.82 in 2014. ▲ Rising

Latest (2014)
86.82
Change on year
up 0.0%
World rank
5th
of 181 countries
All-time high
86.9
in 2012
All-time low
70.32
in 2005
Years of data
10
2005–2014

Dealing with construction permits (DB06-15 methodology) - Score in United Kingdom, 2005–2014

0204060802005200920142005: 70.32006: 70.32007: 70.52008: 70.52009: 85.82010: 85.72011: 86.92012: 86.92013: 86.82014: 86.8

Source: World Bank.

Analysis

The most recent figure for dealing with construction permits (db06-15 methodology) - score in United Kingdom is 86.82, measured in 2014.

The figure is up 23.5% over ten years.

Over the whole period, dealing with construction permits (db06-15 methodology) - score in United Kingdom peaked at 86.9 in 2012 and was at its lowest, 70.32, in 2005.

United Kingdom ranks 5th of 181 countries on this measure, in the top 10%.

Averages by decade

DecadeAverage LowestHighest Years
2000s 73.47 70.32 85.77 5
2010s 86.61 85.72 86.9 5

Countries ranked near United Kingdom

  1. 2 Denmark 89.84 compare
  2. 3 Hong Kong 88.29 compare
  3. 4 Georgia 87.6 compare
  4. 6 United Arab Emirates 86.38 compare
  5. 7 Taiwan 86.14 compare
  6. 8 South Korea 85.98 compare

See the full ranking of 183 places →

More private sector data for United Kingdom

All data for United Kingdom →

Frequently asked questions

What is dealing with construction permits (db06-15 methodology) - score in United Kingdom?
Dealing with construction permits (db06-15 methodology) - score in United Kingdom was 86.82 in 2014, according to the World Bank.
What is the highest dealing with construction permits (db06-15 methodology) - score recorded in United Kingdom?
The highest recorded value was 86.9 in 2012.
What is the lowest dealing with construction permits (db06-15 methodology) - score recorded in United Kingdom?
The lowest recorded value was 70.32 in 2005.
How does United Kingdom rank for dealing with construction permits (db06-15 methodology) - score?
United Kingdom ranks 5th out of 181 countries with data for 2014.
Is dealing with construction permits (db06-15 methodology) - score rising or falling in United Kingdom?
Over the last ten years it is up 23.5%. The long-run trend across the full record is rising.
Where does this United Kingdom data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB06-15 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.