Hong Kong vs United Kingdom: Dealing with construction permits (DB06-15 methodology) - Score

Hong Kong
88.29
in 2014
United Kingdom
86.82
in 2014
Hong Kong rank
3rd
United Kingdom rank
5th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Hong Kong
  • United Kingdom
020406080200520092014

How they compare

Hong Kong currently reports 88.29 against 86.82 in United Kingdom, a difference of 1.47.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was United Kingdom ahead.

Hong Kong ranks 3rd and United Kingdom ranks 5th of 184 countries.

Across the 2 decades both report, Hong Kong averaged higher in 1 and United Kingdom in 1.

Head to head by decade

Decade Hong Kong United Kingdom Difference Ahead
2000s 64.77 73.47 8.7 United Kingdom
2010s 88.28 86.61 1.67 Hong Kong

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Hong Kong or United Kingdom?
Hong Kong, at 88.29 against 86.82 in United Kingdom as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Hong Kong and United Kingdom?
1.47, with Hong Kong ahead.
How many years of comparable data are there for Hong Kong and United Kingdom?
10 years are reported by both, from 2005 to 2014.
How do Hong Kong and United Kingdom rank globally for dealing with construction permits (db06-15 methodology) - score?
Hong Kong ranks 3rd and United Kingdom ranks 5th of 184 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Hong Kong vs United Kingdom: Dealing with construction permits (DB06-15 methodology) - Score. Statizoid. Retrieved 27 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-db06-15-methodology-score/hong-kong-sar-china/united-kingdom/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-db06-15-methodology-score/hong-kong-sar-china/united-kingdom/">Hong Kong vs United Kingdom: Dealing with construction permits (DB06-15 methodology) - Score</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
184 places, 1,819 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.