Tonga vs Yemen, Rep.: Dealing with construction permits (DB06-15 methodology) - Score

Tonga
75.57
in 2014
Yemen, Rep.
75.4
in 2014
Tonga rank
41st
Yemen, Rep. rank
42nd

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Tonga
  • Yemen, Rep.
020406080200520092014

How they compare

Tonga currently reports 75.57 against 75.4 in Yemen, Rep., a difference of 0.17.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was Yemen, Rep. ahead.

Tonga ranks 41st and Yemen, Rep. ranks 42nd of 181 countries.

Yemen, Rep. has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Tonga Yemen, Rep. Difference Ahead
2000s 64.39 81.07 16.67 Yemen, Rep.
2010s 74.31 78.03 3.72 Yemen, Rep.

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Tonga or Yemen, Rep.?
Tonga, at 75.57 against 75.4 in Yemen, Rep. as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Tonga and Yemen, Rep.?
0.17, with Tonga ahead.
How many years of comparable data are there for Tonga and Yemen, Rep.?
10 years are reported by both, from 2005 to 2014.
How do Tonga and Yemen, Rep. rank globally for dealing with construction permits (db06-15 methodology) - score?
Tonga ranks 41st and Yemen, Rep. ranks 42nd of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.