Dealing with construction permits (DB06-15 methodology) - Score in Tonga

Tonga: Dealing with construction permits (DB06-15 methodology) - Score was 75.57 in 2014. ▲ Rising

Latest (2014)
75.57
Change on year
up 0.2%
World rank
41st
of 184 countries
All-time high
75.57
in 2014
All-time low
60.29
in 2005
Years of data
10
2005–2014

Dealing with construction permits (DB06-15 methodology) - Score in Tonga, 2005–2014

0204060802005200920142005: 60.32006: 62.92007: 61.22008: 67.32009: 70.22010: 72.82011: 73.22012: 74.62013: 75.42014: 75.6

Source: World Bank.

Analysis

Tonga recorded 75.57 for dealing with construction permits (db06-15 methodology) - score in 2014. That is the highest value across all 10 years on record.

That represents a change of up 0.2% on the previous year and up 25.3% over ten years.

Over the whole period, dealing with construction permits (db06-15 methodology) - score in Tonga peaked at 75.57 in 2014 and was at its lowest, 60.29, in 2005.

Tonga ranks 41st of 184 countries on this measure, in the top quarter.

Dealing with construction permits (DB06-15 methodology) - Score in Tonga, year by year

Annual values for Dealing with construction permits (DB06-15 methodology) - Score in Tonga, 2005 to 2014.
Year Value Change
2005 60.29 —
2006 62.92 +4.4%
2007 61.23 -2.7%
2008 67.32 +9.9%
2009 70.19 +4.3%
2010 72.75 +3.6%
2011 73.23 +0.7%
2012 74.55 +1.8%
2013 75.44 +1.2%
2014 75.57 +0.2%

Tonga compared with similar countries

  • Tonga's 75.57 is above the median for upper middle income countries, which is 69.61, 1.1× the median. (55 countries reporting)
  • Tonga's 75.57 is above the median for East Asia & Pacific, which is 73.19, 1.0× the median. (27 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 64.39 60.29 70.19 5
2010s 74.31 72.75 75.57 5

Countries ranked near Tonga

  1. 38 Eswatini 75.86 compare
  2. 39 Dominica 75.65 compare
  3. 40 Switzerland 75.65 compare
  4. 42 Yemen 75.4 compare
  5. 43 Sri Lanka 74.94 compare
  6. 44 Fiji 74.57 compare

See the full ranking of 184 places →

More private sector data for Tonga

All data for Tonga →

Frequently asked questions

What is dealing with construction permits (db06-15 methodology) - score in Tonga?
Dealing with construction permits (db06-15 methodology) - score in Tonga was 75.57 in 2014, according to the World Bank.
What is the highest dealing with construction permits (db06-15 methodology) - score recorded in Tonga?
The highest recorded value was 75.57 in 2014.
What is the lowest dealing with construction permits (db06-15 methodology) - score recorded in Tonga?
The lowest recorded value was 60.29 in 2005.
How does Tonga rank for dealing with construction permits (db06-15 methodology) - score?
Tonga ranks 41st out of 184 countries with data for 2014.
Is dealing with construction permits (db06-15 methodology) - score rising or falling in Tonga?
Over the last ten years it is up 25.3%. The long-run trend across the full record is rising.
Where does this Tonga data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB06-15 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits (DB06-15 methodology) - Score in Tonga. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db06-15-methodology-score/tonga/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db06-15-methodology-score/tonga/">Dealing with construction permits (DB06-15 methodology) - Score in Tonga</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
184 places, 1,819 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.