Dealing with construction permits (DB06-15 methodology) - Score in Tonga

Tonga: Dealing with construction permits (DB06-15 methodology) - Score was 75.57 in 2014. ▲ Rising

Latest (2014)
75.57
Change on year
up 0.2%
World rank
41st
of 181 countries
All-time high
75.57
in 2014
All-time low
60.29
in 2005
Years of data
10
2005–2014

Dealing with construction permits (DB06-15 methodology) - Score in Tonga, 2005–2014

0204060802005200920142005: 60.32006: 62.92007: 61.22008: 67.32009: 70.22010: 72.82011: 73.22012: 74.62013: 75.42014: 75.6

Source: World Bank.

Analysis

Tonga recorded 75.57 for dealing with construction permits (db06-15 methodology) - score in 2014. That is the highest value across all 10 years on record.

That represents a change of up 0.2% on the previous year and up 25.3% over ten years.

Over the whole period, dealing with construction permits (db06-15 methodology) - score in Tonga peaked at 75.57 in 2014 and was at its lowest, 60.29, in 2005.

Tonga ranks 41st of 181 countries on this measure, in the top quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 64.39 60.29 70.19 5
2010s 74.31 72.75 75.57 5

Countries ranked near Tonga

  1. 38 Eswatini 75.86 compare
  2. 39 Dominica 75.65 compare
  3. 40 Switzerland 75.65 compare
  4. 42 Yemen 75.4 compare
  5. 43 Sri Lanka 74.94 compare
  6. 44 Fiji 74.57 compare

See the full ranking of 183 places →

More private sector data for Tonga

All data for Tonga →

Frequently asked questions

What is dealing with construction permits (db06-15 methodology) - score in Tonga?
Dealing with construction permits (db06-15 methodology) - score in Tonga was 75.57 in 2014, according to the World Bank.
What is the highest dealing with construction permits (db06-15 methodology) - score recorded in Tonga?
The highest recorded value was 75.57 in 2014.
What is the lowest dealing with construction permits (db06-15 methodology) - score recorded in Tonga?
The lowest recorded value was 60.29 in 2005.
How does Tonga rank for dealing with construction permits (db06-15 methodology) - score?
Tonga ranks 41st out of 181 countries with data for 2014.
Is dealing with construction permits (db06-15 methodology) - score rising or falling in Tonga?
Over the last ten years it is up 25.3%. The long-run trend across the full record is rising.
Where does this Tonga data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB06-15 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.