Bolivia vs Zimbabwe: Dealing with construction permits (DB16-20 methodology) - Score

Bolivia
60.04
in 2019
Zimbabwe
60
in 2019
Bolivia rank
138th
Zimbabwe rank
139th

Dealing with construction permits (DB16-20 methodology) - Score over time

  • Bolivia
  • Zimbabwe
0204060201420162019

How they compare

Bolivia currently reports 60.04 against 60 in Zimbabwe, a difference of 0.04.

Across all 6 years both countries report, Bolivia has been ahead every year.

Bolivia ranks 138th and Zimbabwe ranks 139th of 188 countries.

Bolivia has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits (db16-20 methodology) - score, Bolivia or Zimbabwe?
Bolivia, at 60.04 against 60 in Zimbabwe as of 2019.
What is the difference in dealing with construction permits (db16-20 methodology) - score between Bolivia and Zimbabwe?
0.04, with Bolivia ahead.
How many years of comparable data are there for Bolivia and Zimbabwe?
6 years are reported by both, from 2014 to 2019.
How do Bolivia and Zimbabwe rank globally for dealing with construction permits (db16-20 methodology) - score?
Bolivia ranks 138th and Zimbabwe ranks 139th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.