Bosnia and Herzegovina vs Brazil: Dealing with construction permits (DB16-20 methodology) - Score

Bosnia and Herzegovina
48.57
in 2019
Brazil
51.92
in 2019
Bosnia and Herzegovina rank
174th
Brazil rank
171st

Dealing with construction permits (DB16-20 methodology) - Score over time

  • Bosnia and Herzegovina
  • Brazil
0204060201420162019

How they compare

Brazil currently reports 51.92 against 48.57 in Bosnia and Herzegovina, a difference of 3.35.

That makes Brazil's figure about 1.1 times Bosnia and Herzegovina's.

Across all 6 years both countries report, Brazil has been ahead every year.

Bosnia and Herzegovina ranks 174th and Brazil ranks 171st of 191 countries.

Brazil has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits (db16-20 methodology) - score, Bosnia and Herzegovina or Brazil?
Brazil, at 51.92 against 48.57 in Bosnia and Herzegovina as of 2019.
What is the difference in dealing with construction permits (db16-20 methodology) - score between Bosnia and Herzegovina and Brazil?
3.35, with Brazil ahead.
How many years of comparable data are there for Bosnia and Herzegovina and Brazil?
6 years are reported by both, from 2014 to 2019.
How do Bosnia and Herzegovina and Brazil rank globally for dealing with construction permits (db16-20 methodology) - score?
Bosnia and Herzegovina ranks 174th and Brazil ranks 171st of 191 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Bosnia and Herzegovina vs Brazil: Dealing with construction permits (DB16-20 methodology) - Score. Statizoid. Retrieved 02 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-db16-20-methodology-score/bosnia-and-herzegovina/brazil/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-db16-20-methodology-score/bosnia-and-herzegovina/brazil/">Bosnia and Herzegovina vs Brazil: Dealing with construction permits (DB16-20 methodology) - Score</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 1,145 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.