Botswana vs Bulgaria: Dealing with construction permits (DB16-20 methodology) - Score

Botswana
75.58
in 2019
Bulgaria
75.93
in 2019
Botswana rank
44th
Bulgaria rank
43rd

Dealing with construction permits (DB16-20 methodology) - Score over time

  • Botswana
  • Bulgaria
020406080201420162019

How they compare

Bulgaria currently reports 75.93 against 75.58 in Botswana, a difference of 0.35.

The two have swapped places 2 times across 6 shared years of data; in 2014 it was Bulgaria ahead.

Botswana ranks 44th and Bulgaria ranks 43rd of 188 countries.

Bulgaria has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits (db16-20 methodology) - score, Botswana or Bulgaria?
Bulgaria, at 75.93 against 75.58 in Botswana as of 2019.
What is the difference in dealing with construction permits (db16-20 methodology) - score between Botswana and Bulgaria?
0.35, with Bulgaria ahead.
How many years of comparable data are there for Botswana and Bulgaria?
6 years are reported by both, from 2014 to 2019.
How do Botswana and Bulgaria rank globally for dealing with construction permits (db16-20 methodology) - score?
Botswana ranks 44th and Bulgaria ranks 43rd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.