Democratic Republic of Congo vs Gambia: Dealing with construction permits (DB16-20 methodology) - Score

Democratic Republic of Congo
59.51
in 2019
Gambia
59.36
in 2019
Democratic Republic of Congo rank
143rd
Gambia rank
144th

Dealing with construction permits (DB16-20 methodology) - Score over time

  • Democratic Republic of Congo
  • Gambia
0204060201420162019

How they compare

Democratic Republic of Congo currently reports 59.51 against 59.36 in Gambia, a difference of 0.15.

The two have swapped places 1 time across 6 shared years of data; in 2014 it was Gambia ahead.

Democratic Republic of Congo ranks 143rd and Gambia ranks 144th of 188 countries.

Gambia has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits (db16-20 methodology) - score, Democratic Republic of Congo or Gambia?
Democratic Republic of Congo, at 59.51 against 59.36 in Gambia as of 2019.
What is the difference in dealing with construction permits (db16-20 methodology) - score between Democratic Republic of Congo and Gambia?
0.15, with Democratic Republic of Congo ahead.
How many years of comparable data are there for Democratic Republic of Congo and Gambia?
6 years are reported by both, from 2014 to 2019.
How do Democratic Republic of Congo and Gambia rank globally for dealing with construction permits (db16-20 methodology) - score?
Democratic Republic of Congo ranks 143rd and Gambia ranks 144th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.